General information

IMO:
9321287
MMSI:
211846360
Callsign:
DIOK
Width:
14.0 m
Length:
48.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tug
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
0.0° / 0.0
Heading:
151.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Hamburg (Norderwerft)
Area:
Germany
Last seen:
2024-12-04
17 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
26 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-13
2024-12-05
21d 7h 18m
2024-11-13
2024-11-13
1h 2m
2024-11-13
2024-11-13
1h 11m
2024-11-11
2024-11-12
1d 58m
2024-11-06
2024-11-11
4d 18h 39m
2024-10-28
2024-11-06
9d 53m
2024-10-16
2024-10-28
11d 21h 16m
2024-10-09
2024-10-09
13h 37m
2024-09-25
2024-09-25
4h
2024-09-12
2024-09-16
4d 33m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hamburg
2024-11-13
Enter
Tinsdal
2024-11-13
Enter
Stade
2024-11-13
Enter
Glueckstadt
2024-11-13
Enter
Brunsbuettel
2024-11-13
Enter
Brunsbuettel Schleuse
2024-11-13
Enter
Note: All times are in UTC

Latest news

Repairs completed

Sat Oct 01 16:58:29 CEST 2016 Timsen

Repairs of the "Bremen Fighter" have finally been completed at the Lloyd Yard in Bremerhaven, three months after having suffered propulsion damage in a wind park on July 1. The ship left the yard on Sep 29 ready for service.

Repair of propulsion after wire wrapped up around propeller

Tue Jul 19 10:59:51 CEST 2016 Timsen

The "Bremen Fighter" had to be drydocked at the Mützelfeldt Yard in Cuxhaven for repairs of propulsion on July 1, 2016, after the ship was damaged during a manoever in a wind park off the Irish coast. A towing wire wrapped up around the propeller shaft when a crane ship was repositioned. The ship limped back to Cuxhaven with the remaining engine. During the recent two weeks the rudder, Propeller, shaft and gear were removed and transported to the manufacturers in Kiel and Hamburg for repairs. In the meantime the ship was towed to the yard quay. The owners hoped to have the repairs completed in October, the damage was estimated to be some 100000 Euros. German reports with photos: http://www.cn-online.de/stadt-land/news/schlepper-bekommt-draht-in-die-schraube.html http://www.cn-online.de/stadt-land/news/reparaturauftrag-fuer-muetzelfeldtwerft.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data