General information

IMO:
9577147
MMSI:
255801470
Callsign:
CQNJ
Width:
40.0 m
Length:
86.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Portugal
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
189.5° / 0.0
Heading:
106.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Eemshaven (Eemshaven Port)
Area:
Netherlands
Last seen:
2024-12-22
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-10
11d 15h 44m
2024-11-20
2024-12-01
11d 9h 35m
2024-10-28
2024-11-02
4d 15h 46m
2024-10-14
2024-10-16
1d 14h 6m
2024-09-18
2024-09-25
7d 7h 1m
2024-09-06
2024-09-06
11h 56m
2024-08-18
2024-08-26
8d 4h 48m
2024-08-01
2024-08-03
1d 11h 59m
2024-07-23
2024-07-26
2d 14h 17m
2024-07-10
2024-07-11
1d 32m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Terschelling
2024-09-17
Leave
Den Helder
2024-09-17
Enter
Calais
2024-09-15
Leave
Dover
2024-09-15
Leave
Dover
2024-08-29
Enter
Calais
2024-08-29
Enter
Den Helder
2024-08-28
Leave
Note: All times are in UTC

Latest news

DP1 jack-up vessel Thor completes short stay at Damen Shiprepair Dunkerque

Thu Jul 07 10:17:25 CEST 2016 arnekiel

The DP1 jack-up vessel Thor owned by the DEME Group has completed a short stay at Damen Shiprepair Dunkerque (DSDu). During her time at the yard her hull was repainted in the new DEME livery and her thrusters inspected. Measuring 70 metres by 40 metres, she spent four days in one of the yard’s drydocks. A special docking solution was required due to the size of her aft thrusters, which are 3.825 metres high. Standard dock blocks are just 1.80 metres. Fortunately, her design supplied the answer as well as the problem, and her four legs were used to maintain the hull at the height required to keep the thrusters clear of the dock bed while the inspection was conducted. In order to spread the considerable load of each leg, wooden platforms were positioned beneath them to ensure that no damage was done to the dock. Following the successful completion of the assignment, Thor departed for Antwerp.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data