General information

IMO:
MMSI:
211515380
Callsign:
DC3400
Width:
11.0 m
Length:
110.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
360.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Rotterdam (Geulhaven)
Area:
Netherlands
Last seen:
2024-11-22
8 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-22
35m
2024-11-20
2024-11-22
1d 18h 13m
2024-11-18
2024-11-20
1d 3h 28m
2024-11-16
2024-11-18
2d 7h 31m
2024-11-05
2024-11-16
11d 8h 47m
2024-11-01
2024-11-02
17h 13m
2024-10-31
2024-11-01
20h 28m
2024-10-31
2024-10-31
20m
2024-10-30
2024-10-31
23h 2m
2024-10-29
2024-10-30
9h 25m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Zandvliet Locks
2024-11-21
Leave
Antwerp Doel
2024-11-21
Leave
Antwerp Doel
2024-11-20
Enter
Antwerp
2024-11-20
Enter
Nauw van Bath
2024-11-20
Leave
Hans Weert
2024-11-20
Enter
Note: All times are in UTC

Latest news

Tank barge repaired after allision

Wed May 03 20:37:18 CEST 2017 Timsen

The "Maria Valentine" which was severely damaged in a lock allision at Grave on Dec 29, 2016, has been repaired during the recent months and started operating again as "Magellan" for the Normannia company in Hamburg. The accident in Grave caused a million Euro damage in the region. The Meuse had not been navigable for weeks, houseboats were lying obliquely and companies could not be supplied. Also tThe damage to the tanker was relatively complicated. The upper deck was broken, including the wheelhouse, but under the waterline there was no major damage. The ship left Rotterdam afer completition of repairs on Apr 24, 2017, and headed for Giessendam as first port of call. Dutch report with photo: http://www.gelderlander.nl/grave/rampschip-grave-blijkt-onverwoestbaar~a2c90d52/

Tank barge lost wheelhouse already in allision in October 2016

Thu Jan 19 10:46:32 CET 2017 Timsen

The 52 year old, Slovakian skipper who was at the helm of the "Maria Valentine" when she allided with the weir at Grave, was already involved in an allision with the same ship two months before. On Oct 22, 2016, the barge lost its wheelhouse when she slammed into the Sterkrade Bridge on the Rhine-Herne Canal in Oberhausen. The allision had been caused by a technical defect, according to the police in Essen, which investigated the accident. The hydraulic system had not functioned satisfactory. The "Maria Valentine" was fitted out with a prefabricated wheelhouse short time later. The cause of the allision on Dec 29 on the Maas was still unknown. In dense fog the tanker ran straight through the steel dam at Grave, pushing it three meters down. Because it did not break completely, Grave and nearby Nederasselt escaped a disaster. Dutch report with photos: http://www.gelderlander.nl/grave/schipper-stuwongeval-voer-eerder-stuurhut-aan-diggelen~aa2c1d7d/

Damaged barge at Afvalstoffen Terminal Moerdijk (ATM)

Fri Jan 06 11:33:13 CET 2017 Timsen

The "Maria Valentine" is currently moored at the Afvalstoffen Terminal Moerdijk (ATM) in Moerdijk which handles hazardous waste. The cargo, consisting of 2000 tons benzene, is to be pumped onto another ship here. The ship was moored at the terminal on Jan 3. Photos underway: https://binnenvaartlog.nl/maria-valentine-afvaart-op-maas/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data