General information

IMO:
9147722
MMSI:
232003073
Callsign:
MXZG2
Width:
13.0 m
Length:
44.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
252.7° / 127.0
Heading:
250.0° / 127.0
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2025-04-27
8 hours ago
 
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
64 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-30
2024-11-30
2h 11m
2024-11-26
2024-11-26
1h 29m
2024-11-01
2024-11-26
25d 44m
2023-12-09
2023-12-10
14h 59m
2023-11-08
2023-12-04
25d 23h 35m
2023-07-25
2023-07-26
16h 51m
2023-07-25
2023-07-25
6h 56m
2023-07-16
2023-07-24
8d 5h 33m
2023-01-12
2023-01-13
17h 23m
2023-01-11
2023-01-12
9h 25m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Sailings cancelled due to technical issue

Wed Apr 09 10:04:54 CEST 2025 Timsen

The 'Loch Alainn', serving on the route Barra - Eriskay, suffered a Technical issue with the toilet on April 8. As a consequence, the scheduled departure from Barra at 3:45 p.m. and from Eriskay at 4:35 p.m. had to be cancelled. After the technical issue has been suceessfully resolved, the vessel will operate the additional sailings from Barra at 7:15 p.m. with an arrival at Eriskay at 7:55 p.m. and from Eriskay at 8:00 p.m., arriving at Barra at 8:40 p.m.

Ferry suffered technical issue

Sun Mar 30 19:10:27 CEST 2025 Timsen

The 'Loch Alainn', serving on the route Ardmhor-Eriskay, suffered a technical issue on March 29, which required further investigations, As a consequence, the scheduled departure from Eriskay at 4:35 p.m. was delayed. At 6:15 p.m. the operator Calmac reported that the technical issue has been resolved, and the ferry was now loading and would be departing as soon as possible.

Ferry suffered technical issue with engine

Wed Mar 26 10:23:57 CET 2025 Timsen

The 'Loch Alainn', serving on the route Barra - Eriskay, suffered a technical issue with the main engine on March 18. As a consequence, the vessel has been removed from service. As the ferry 'Loch Bhrusda' was unable to operate due to crew availability, all vehicle sailings were cancelled. A passenger charter vessel was operating an amended timetable on March 18 and 19:. After the repairs to the main engine have been completed on March 20, the sailings were expected to operate according to the published timetable. A slight issue with a sensor was identified. The crew will continue to monitor, and spares weere in transit to the vessel. The 09:15 a.m. departure from Ardmhor departed from Barra at approximately 09:30 a.m. instead. The morning sailings were remaining liable to disruption or cancellation at short notice. After the technical issue has been resolved,the 'Loch Alainn' resumed the scheduled service on March 21 with a delayed 11:10 p.m. departure from Ardmhor.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data