General information

IMO:
9147722
MMSI:
232003073
Callsign:
MXZG2
Width:
13.0 m
Length:
44.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
344.0° / -127.0
Heading:
336.0° / -127.0
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2024-12-01
61 days ago
 
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
61 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-30
2024-11-30
2h 11m
2024-11-26
2024-11-26
1h 29m
2024-11-01
2024-11-26
25d 44m
2023-12-09
2023-12-10
14h 59m
2023-11-08
2023-12-04
25d 23h 35m
2023-07-25
2023-07-26
16h 51m
2023-07-25
2023-07-25
6h 56m
2023-07-16
2023-07-24
8d 5h 33m
2023-01-12
2023-01-13
17h 23m
2023-01-11
2023-01-12
9h 25m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Ferry suffered issue with fire pumps

Fri Dec 20 09:51:48 CET 2024 Timsen

The 'Loch Alainn', serving on the route Ardmhor-Eriskay, suffered a technical issue with the fire pumps on Dec 19, 2024. As a result, the scheduled departure from Barra at 5.20 p.mn. and from Eriskay at 6.15 p.m. were cancelled. On Dec 20, the 07:15 a.m. departure from Barra and the 08:10 a.m. departure from Eriskay were liable to disruption or cancellation. A further update was to be provided once known.

Ferry suffered propulsion trouble

Wed Dec 11 09:40:54 CET 2024 Timsen

The 'Loch Alainn', serving on the route Barra-Eriskay, picked up a suspected foreign object in its propulsion on Dec 11, 2024. As a consequence, the 04:45 a.m. sailing from Ardmhor hwas delayed. An update was to be provided once more information has become available.

Ferry suffered technical issue

Sat Oct 19 17:23:39 CEST 2024 Timsen

The 'Loch Alainn' suffered a technical issue with the fuel pump on Oct 19, 2024. As a consequence, this service had to be cancelled. Aftera spare part had been sourced, the issue has been resolved, and the ferry resumed its service at 09:25 a.m. from Ardmhor (Barra).

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data