Allgemeine Informationen

IMO:
9147722
MMSI:
232003073
Rufzeichen:
MXZG2
Breite:
13.0 m
Länge:
44.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
344.0° / -127.0
Kompasskurs:
336.0° / -127.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Inner Seas
Zuletzt empfangen::
2024-12-01
vor 27 Tagen
 
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 27 Tagen 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-30
2024-11-30
2h 11m
2024-11-26
2024-11-26
1h 29m
2024-11-01
2024-11-26
25d 44m
2023-12-09
2023-12-10
14h 59m
2023-11-08
2023-12-04
25d 23h 35m
2023-07-25
2023-07-26
16h 51m
2023-07-25
2023-07-25
6h 56m
2023-07-16
2023-07-24
8d 5h 33m
2023-01-12
2023-01-13
17h 23m
2023-01-11
2023-01-12
9h 25m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Ferry suffered issue with fire pumps

Fri Dec 20 09:51:48 CET 2024 Timsen

The 'Loch Alainn', serving on the route Ardmhor-Eriskay, suffered a technical issue with the fire pumps on Dec 19, 2024. As a result, the scheduled departure from Barra at 5.20 p.mn. and from Eriskay at 6.15 p.m. were cancelled. On Dec 20, the 07:15 a.m. departure from Barra and the 08:10 a.m. departure from Eriskay were liable to disruption or cancellation. A further update was to be provided once known.

Ferry suffered propulsion trouble

Wed Dec 11 09:40:54 CET 2024 Timsen

The 'Loch Alainn', serving on the route Barra-Eriskay, picked up a suspected foreign object in its propulsion on Dec 11, 2024. As a consequence, the 04:45 a.m. sailing from Ardmhor hwas delayed. An update was to be provided once more information has become available.

Ferry suffered technical issue

Sat Oct 19 17:23:39 CEST 2024 Timsen

The 'Loch Alainn' suffered a technical issue with the fuel pump on Oct 19, 2024. As a consequence, this service had to be cancelled. Aftera spare part had been sourced, the issue has been resolved, and the ferry resumed its service at 09:25 a.m. from Ardmhor (Barra).

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data