LOCH ALAINN
Kurs/Position
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Ferry suffered technical issue with battery
The 'Loch Alainn',, serving on the route Barra-Eriskay, suffered a technical issue with the vessel's batteries on Feb 13. As a consequence, the scheduled departure from Barra was at risk to be delayed or cancelled. Afer the issue was successfully resolved, the ferry sailed from Barra.
Ferry suffered technical issue
The 'Loch Alainn'. serving on the route Ardmhor-Eriskay, suffered a technical issue on the morning of Feb 6, 2025, which required further investigations and repairs. As a consequence, the scheduledd departures from Barra at 05:20 a.m., 07:15 a.m. and 09:15 a.m. and from Eriskay at 06:10 a.m.,, 08:10 a.m. and 10:10 a.m. had to be cancelled, while troubleshooting was underway. After the repairs have been completed successfully, the sailings from Barra at 09:15 a.m. and from Eriskay at 10:10 a.m. were reinstade.
Ferry suffered issue with fire pumps
The 'Loch Alainn', serving on the route Ardmhor-Eriskay, suffered a technical issue with the fire pumps on Dec 19, 2024. As a result, the scheduled departure from Barra at 5.20 p.mn. and from Eriskay at 6.15 p.m. were cancelled. On Dec 20, the 07:15 a.m. departure from Barra and the 08:10 a.m. departure from Eriskay were liable to disruption or cancellation. A further update was to be provided once known.
News schreiben