General information

IMO:
MMSI:
269057248
Callsign:
HE7248
Width:
11.0 m
Length:
108.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Wing-in-ground craft
Ship type:
Flag:
Switzerland
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
341.0° / 0.0
Heading:
117.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Speyer (Speyer Werfthafen Marina)
Area:
Germany
Last seen:
2024-11-13
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-05
8d 44m
2024-10-29
2024-11-05
7d 4h 32m
2024-10-26
2024-10-28
2d 14h 5m
2024-10-25
2024-10-26
15h 48m
2024-10-24
2024-10-24
5h 24m
2024-10-22
2024-10-22
1h 34m
2024-10-20
2024-10-20
46m
2024-10-19
2024-10-19
13h 12m
2024-10-18
2024-10-19
15h 24m
2024-10-17
2024-10-17
6h 23m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Schleuse Breisach Sued
2024-09-29
Leave
Weil Rhein Nord
2024-09-29
Leave
Weil Rhein Nord
2024-09-27
Enter
Schleuse Breisach Sued
2024-09-27
Enter
Schleuse Breisach Sued
2024-09-01
Leave
Weil Rhein Nord
2024-09-01
Leave
Weil Rhein Nord
2024-08-30
Enter
Note: All times are in UTC

Latest news

Water too shallow for second asylum ship in Meppel

Wed Nov 02 10:56:35 CET 2022 Timsen

The second refugee ship, the 'Crucevita', has arrived in the Meppel port en route from Lelystad on Nov 1, 2022. The ship can accommodate 110 refugees. The intention was that the vessel would berth at Zomerdijk, but it turned out that the waterwas too shallow. The ship is therefore now in Staphorster waters. The bottom of the Meppeler Deep will be leveled in the coming days by the municipality of Meppel. New paving and utilities are currently being worked on at the Zomerdijk so that the ship is accessible. Extra paving has also been laid for parking spaces and the placement of office units, in which the staff will soon be able to work. The biggest challenge turned out to be staffing. Getting security guards is still the biggest challenge. The first refugees will arrive next week. Report with photo and video: https://www.rtvdrenthe.nl/nieuws/15084134/asielboot-kan-niet-aanmeren-in-meppel-door-lage-waterstand

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data