General information

IMO:
9377913
MMSI:
255915898
Callsign:
CQ2356
Width:
14.0 m
Length:
90.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Portugal
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
335.8° / 0.0
Heading:
161.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Porto Nogaro (Porto Nogaro Port)
Area:
Italy
Last seen:
2024-12-23
2 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
17 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-20
2d 22h 42m
2024-12-16
2024-12-18
1d 21h 28m
2024-11-03
2024-12-10
36d 22h 3m
2024-11-01
2024-11-02
17h 40m
2024-10-06
2024-10-11
4d 22h 49m
2024-10-02
2024-10-03
1d 2h 7m
2024-09-30
2024-10-01
1d 6h 57m
2024-09-21
92d 9h 53m
2024-09-15
2024-09-20
5d 5h 23m
2024-09-12
2024-09-15
2d 20h 40m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 1
2024-12-11
Enter
Bosphorus Bridge 2
2024-12-11
Enter
Bosphorus Bridge 1
2024-11-03
Leave
Pantelleria East
2024-10-23
Enter
El-Jazair
2024-10-23
Leave
Sizilien
2024-10-23
Enter
Isla de Alboran
2024-10-20
Enter
Note: All times are in UTC

Latest news

Grounding off Stylida

Tue May 11 20:40:14 CEST 2021 Timsen

The 'Moseldijk' enroute from Hamburg to Stylida with a cargo of fertilizer, ran aground in the morning of May 11, 2021, 70 meters off the port of destination. Because the water had receded, it got stuck on sandy bottom with its draft of 5,80 meters. The incident was reported to the Port Authority of Stylida which carried out a check without noticing any pollution. The 'Ierax' was deployed to the scene. Due to a rise of the water level the ship managed to refloat later. Greek report with photos and video: https://tvstar.gr/2021/05/11/kinitopoiisi-sti-stylida-ploio-kollise-stin-ammo-ligo-prin-to-limanifoto-video/

Leak at engine coupling

Mon Jun 11 09:57:41 CEST 2018 Timsen

The “Moseldijk”, en route from Ghent to Cork, with a crew of seven on board, reported a small leak and a need to change a rubber coupling on the main engine in position 50 59 50.0 N, 001 02 01.8 E, on June 8, 2018, at 6.45 p.m. Subsequently, the vessel left the Strait of Dover Traffic Separation Scheme and headed to to Dungeness East Road Anchorage to carry out repairs. The ship was loaded with 3,508 tons of fertiliser, along with 55 tons bunker fuel. On June 9 at 2.50 a.m. the vessel has completed its repair works and passed the CS2 buoy, under its own power. The Dover Coastguard monitored the ship until it had passed the Greenwich light vessel. The "Moseldijk" berthed in Cork on June 10 at 5 p.m.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data