General information

IMO:
9280110
MMSI:
211876190
Callsign:
DFJY
Width:
10.0 m
Length:
68.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
18.1° / 0.0
Heading:
353.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Bremerhaven (Verbindungshafen)
Area:
West Europe
Last seen:
2025-02-22
6 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2025-02-22
6h 57m
2025-02-22
2025-02-22
2h 50m
2025-02-21
2025-02-21
13h 56m
2025-02-20
2025-02-20
9h 17m
2025-02-18
2025-02-19
1d 53m
2025-02-18
2025-02-18
3h 54m
2025-02-18
2025-02-18
2h 59m
2025-02-17
2025-02-18
18h 33m
2025-02-15
2025-02-16
8h 10m
2025-02-14
2025-02-14
6h 48m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bremerhaven
2025-02-22
Enter
Mellum
2025-02-22
Enter
Weser Pilot Innen
2025-02-22
Enter
Lighthouse Roter Sand
2025-02-22
Enter
Wangerooge
2025-02-22
Enter
Wangerooge
2025-02-22
Leave
Elbe 1
2025-02-22
Leave
Note: All times are in UTC

Latest news

Bunker tanker damaged in allision

Mon Mar 25 21:09:55 CET 2019 Timsen

The Liberian flagged container m/v "Calisto", 15487 gt (IMO: 9306067), on March 24, 2019, allided with the quay of the Elbe Port Brunsbüttel on its way towards the Kiel Canal locks and also hit the German bunker tanker "Claudia" which was moored alongside the berthed bulk carrier "i´Interlink Affinity". The tanker's moorings and the bunkering hose broke, followed by a fuel leak. An estimated amount of 0,2 tons of fuel leaked overboard. The bulk carrier was slightly damaged, the tanker suffered more serious damages. The "Interlink Affinity" The freighter had berthed in the Elbe Port on March 21, coming from Colon, and actually remained berthed. It suffered damage too when the "Calisto" got out of control. The "Claudia" entered the Muetzelfeldt-Yard in Cuxhaven on March 24 at 7.30 p.m. for repairs which were completed on April 8.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data