Allgemeine Informationen

IMO:
9280110
MMSI:
211876190
Rufzeichen:
DFJY
Breite:
10.0 m
Länge:
68.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Germany
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
1.2° / 0.0
Kompasskurs:
3.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Bremerhaven (Neue Schleuse BHV)
Gebiet:
Germany
Zuletzt empfangen::
2025-03-03
vor 2 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-03-03
6h 39m
2025-03-02
2025-03-02
5h 39m
2025-03-01
2d 5h 4m
2025-03-01
2025-03-02
11h 53m
2025-02-27
2025-03-01
1d 5h 7m
2025-02-27
2025-02-27
7h 19m
2025-02-26
2025-02-27
17h 56m
2025-02-25
2025-02-26
6h 41m
2025-02-24
2025-02-25
14h 42m
2025-02-24
2025-02-24
3h 56m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Bremerhaven
2025-03-03
Ankommen
Mellum
2025-03-03
Ankommen
Weser Pilot Innen
2025-03-03
Ankommen
Lighthouse Roter Sand
2025-03-03
Ankommen
Elbe 1
2025-03-03
Abfahren
Cuxhaven
2025-03-03
Abfahren
Brunsbuettel
2025-03-03
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Bunker tanker damaged in allision

Mon Mar 25 21:09:55 CET 2019 Timsen

The Liberian flagged container m/v "Calisto", 15487 gt (IMO: 9306067), on March 24, 2019, allided with the quay of the Elbe Port Brunsbüttel on its way towards the Kiel Canal locks and also hit the German bunker tanker "Claudia" which was moored alongside the berthed bulk carrier "i´Interlink Affinity". The tanker's moorings and the bunkering hose broke, followed by a fuel leak. An estimated amount of 0,2 tons of fuel leaked overboard. The bulk carrier was slightly damaged, the tanker suffered more serious damages. The "Interlink Affinity" The freighter had berthed in the Elbe Port on March 21, coming from Colon, and actually remained berthed. It suffered damage too when the "Calisto" got out of control. The "Claudia" entered the Muetzelfeldt-Yard in Cuxhaven on March 24 at 7.30 p.m. for repairs which were completed on April 8.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data