General information

IMO:
MMSI:
244890610
Callsign:
PC6682
Width:
12.0 m
Length:
182.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
360.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Antwerp (PSA North Sea Terminal)
Area:
West Europe
Last seen:
2024-11-14
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-11
2d 23h 59m
2024-11-09
2024-11-09
44m
2024-11-09
2024-11-09
36m
2024-11-09
2024-11-09
10h 25m
2024-11-09
2024-11-09
41m
2024-11-08
2024-11-08
34m
2024-11-08
2024-11-08
37m
2024-11-08
2024-11-08
28m
2024-11-08
2024-11-08
29m
2024-11-08
2024-11-08
29m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Antwerp Doel
2024-11-14
Leave
Antwerp Doel
2024-11-14
Enter
Berendrecht Locks
2024-11-14
Enter
Zandvliet Locks
2024-11-13
Leave
Zandvliet Locks
2024-11-13
Enter
Berendrecht Locks
2024-11-12
Leave
Antwerp Doel
2024-11-12
Leave
Note: All times are in UTC

Latest news

Allision on the Rhein at Weil

Sat Jun 23 13:22:59 CEST 2018 Timsen

On the Rhine at Weil the "Alorba“, 3178 ts (EU-No.: 02336829;), pushing the "Alorba II", 2432 ts (EU-No.: 02335033), allided with the Palmrain Bridge on June 23, 2018, at 4.30 a.m. The vessel was loaded with containers and coming from Basel, sailing northwards. Short before passing the bridge, the master remarked that the hydraulic to lower the wheelhouse failed. Short time later it slammed against the bridge. The man fled in time, but was slightly hurt by glas splinters. The wheelhouse was pushed backwards and suffered severe damage. The ship pcould be anchored at the height of the port Nord on the French river side. The master alerted the traffic control in Basel which informed rescue services in Germany and France. The barge could be shifted to the German river side in the foremidday and moored at the shore. An operation center was established in the port of Weil. The fire rescue transferred the injured master ashore where he was medically treated. the Palmrain Bridge was closed for traffic by the police at 8 a.m. until surveys had been carried out. The barge left the port again on June 28 at 11.30 a.m. It berthed in the Beatrix Port in Werkendam on July 4 at 4.15 a.m. German report with photos: http://www.badische-zeitung.de/weil-am-rhein/containerschiff-kollidiert-mit-der-weiler-palmrainbruecke--153879904.html

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data