Allgemeine Informationen

IMO:
9759501
MMSI:
211666720
Rufzeichen:
DHNV2
Breite:
10.0 m
Länge:
26.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
High-Speed Craft
Ship type:
Flagge:
Germany
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
359.6° / 0.0
Kompasskurs:
277.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Borkum (Borkum Hafen)
Gebiet:
North Sea
Zuletzt empfangen::
2024-11-21
vor 2 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 23 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-15
6d 4h 21m
2024-11-15
2024-11-15
3h 35m
2024-11-07
2024-11-15
8d 3h 10m
2024-11-06
2024-11-07
13h 50m
2024-11-05
2024-11-06
15h 27m
2024-11-04
2024-11-05
13h 33m
2024-11-03
2024-11-04
13h 1m
2024-10-30
2024-11-03
3d 14h 4m
2024-10-30
2024-10-30
8h
2024-10-29
2024-10-30
11h 44m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Fischerbalje
2024-11-15
Abfahren
Delfzijl
2024-11-15
Abfahren
Delfzijl
2024-11-07
Ankommen
Fischerbalje
2024-11-07
Ankommen
Fischerbalje
2024-11-06
Abfahren
Fischerbalje
2024-11-06
Ankommen
Fischerbalje
2024-11-05
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Crew ship started trials after repairs

Sat Dec 13 19:01:43 CET 2014 Timsen

The "Windea Three" has left the drydock of the Emder Shipyard and started trials on the Ems on Dec 13. Photos: http://forum-schiff.de/phpBB3/viewtopic.php?f=9&t=6007#p110140

Grounding on Scharhörn Reef

Tue Dec 09 21:10:53 CET 2014 Timsen

The "Windea Three" ran aground on the Scharhörn Reef off in the evening of Dec 6, 2014, while underway to the port. The ship got stuck at the edge of the bar around 16 nm NW of Cuxhaven. Due to an approaching storm the lifeboat "Hermann Helms" from the local DGzRS station immediately responded. The daughter boat "Biene" was unable to pull the supply ship off, so the lifeboat in spite of its draught of about two meters, which was about as much as the "Windea Three" had, approached the vessel in the surf, thereby touching the bottom several times itself. Finally a towing connection could be established, and the "Windea Three" was towed from the bar. The crew of seven was uninjured. The lifeboat escorted the "Windea Three" to the fishing port of Cuxhaven where both ships berthed around 9 p.m. The "Windea Three", which had started its service for the AG Offshore Ems only on 11 November, left Cuxhaven on Dec 8 entered the Emder Shipyard for repairs on Dec 9 around 6 a.m. Photos: https://www.facebook.com/amy.seehafen/media_set?set=a.353553478159582.1073742280.100005147980512&type=1

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data