Allgemeine Informationen

IMO:
9230127
MMSI:
249393000
Rufzeichen:
9HQZ9
Breite:
32.0 m
Länge:
190.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
322.8° / 0.0
Kompasskurs:
0.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Douala (Dangote Cement Company)
Gebiet:
West Africa
Zuletzt empfangen::
2024-10-17
vor 26 Tagen
 
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 26 Tagen 
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-10-12
2024-10-18
5d 16h 19m
2024-10-06
2024-10-09
3d 1h 47m
2024-09-22
2024-09-29
6d 22h 43m
2024-09-13
2024-09-20
7d 2h 46m
2024-08-08
2024-08-13
4d 21h 54m
2024-08-05
2024-08-05
12m
2024-08-02
2024-08-02
2m
2024-08-01
2024-08-01
1h 51m
2024-07-31
2024-07-31
9h 33m
2024-07-31
2024-07-31
14m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Strait of Gibraltar
2024-08-29
Ankommen
Isla de Alboran
2024-08-29
Abfahren
El-Jazair
2024-08-28
Ankommen
Pantelleria East
2024-08-26
Abfahren
Sizilien
2024-08-26
Abfahren
Pantelleria East
2024-07-22
Ankommen
Sizilien
2024-07-22
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Fire crews left scene

Tue May 29 10:11:09 CEST 2018 Timsen

The crews of the Hampshire Fire Service have left Southampton docks after over 24-hours of firefighting aboard the "Sirina" at the vehicle terminal in Southampton on May 26. The returned throughout the evening to reinspect the scene of the fire. The firefighters had been working alongside their partners and the port agencies and were recommended for their work. the ship left port on June 20, bound to Gibraltar, ETA June 25.

Fire in Southampton

Sun May 27 14:38:36 CEST 2018 Timsen

The Hampshire Fire & Rescue Service Control was alerted after a fire broke out in a hold of the "Sirina" on May 25, 2018, at 2 p.m. The bulkcarrier was berthed at Southampton Western Docks and being loaded with scrap metal, which went on fire during the cargo operations. 60 firefighters from eíght stations and 7.000 tonnes of scrap were involved out of 28.000 tonnes on board. The Southamtpon's coastguard rescue team worked through the night to assist the Hampshire Fire and Rescue at the King George V dock. Report with video: http://www.dailyecho.co.uk/news/16250896.PHOTOS_AND_VIDEO__Crews_battle_fire_on_board_a_ship_at_Southampton_docks/

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data