Allgemeine Informationen

IMO:
9637868
MMSI:
577087000
Rufzeichen:
YJSA9
Breite:
83.0 m
Länge:
77.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Vanuatu
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
349.8° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Gebiet:
North Sea
Zuletzt empfangen::
2024-12-22
vor 1 Std
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-06-06
2024-08-25
79d 20h 54m
2024-05-27
2024-06-02
5d 18h 51m
2020-05-16
2020-10-05
141d 11h 2m
2019-10-01
2019-11-13
43d 18h 25m
2018-08-12
2018-12-25
134d 20h 12m
2017-12-04
2018-02-10
67d 18h 39m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Den Helder
2024-12-11
Abfahren
Terschelling
2024-12-10
Ankommen
Terschelling
2024-08-26
Abfahren
Den Helder
2024-08-26
Ankommen
Hook of Holland
2024-08-25
Abfahren
Dirkzwager Maassluis
2024-08-25
Ankommen
Dirkzwager Maassluis
2024-06-06
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Greenpeace entered drilling platform near Borkum

Wed Jun 05 08:52:13 CEST 2024 Timsen

The highest Dutch court has issued a temporary halt to construction on a gas well near Borkum on June 4, 2024. Greenpeace had previously protested on the drilling platform. The German Environmental Aid (DUH) , along with other partner organizations, had submitted an urgent application against the planned drilling. The court followed this. A final decision will be made next week after a hearing. The DUH accuses the energy company One-Dyas and the Dutch Ministry of Economic Affairs and Climate Protection of circumventing a previous court-ordered halt to construction by amending the permit. The Dutch Ministry of Economic Affairs cleared the way for the controversial project on on May 29 after One-Dyas had made adjustments to the environmental requirements for the construction work in accordance with a previous court order. The 'Prospector 1' was brought by One-Dyas to the planned extraction site northwest of Borkum on the night of June 3 to start preparatory work for natural gas extraction. Greenpeace members protested against this on the morning of Juen 4. Some activists secured themselves to a platform and prevented the preparatory work from starting. One-Dyas reacted with incomprehension to the action, but assured that it would do everything to ensure the safety of the activists and the crew. One-Dyas announced last week that it was sticking to the goal of producing the first natural gas this year. Reports with photos and video: https://www.greenpeace.de/klimaschutz/energiewende/gasausstieg/kein-neues-gas https://www.ndr.de/nachrichten/niedersachsen/oldenburg_ostfriesland/Gasbohrungen-vor-Borkum-Gericht-erlaesst-vorlaeufigen-Baustopp,bohrplattform102.html

Allision in Ijmuiden

Sun Dec 16 17:17:42 CET 2018 Timsen

On Dec 7, 2017, the reefer "Scombrus" was in allision with the "Prospector I" which was berthed in the Haringhaven in the port of Ijmuiden. The reefer suffered damage of the hull at starboardside amidships and berthed at the cutter quay at 7.40 p.m. where it remained under repair since. No reports on damages on the drill vessel. Photos: http://www.shipspotting.com/gallery/photo.php?lid=2945895 http://www.shipspotting.com/gallery/photo.php?lid=2945893 http://www.shipspotting.com/gallery/photo.php?lid=2945896

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data