Allgemeine Informationen

IMO:
9208198
MMSI:
257113350
Rufzeichen:
LAKT8
Breite:
22.0 m
Länge:
143.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Norway
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
101.4° / 0.0
Kompasskurs:
103.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Mediterranean Sea
Zuletzt empfangen::
2024-11-21
vor 11 Std
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 12 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-07
2024-11-09
2d 46m
2024-11-03
2024-11-06
2d 22h 38m
2024-10-15
2024-10-19
3d 15h 43m
2024-10-07
2024-10-10
3d 3h 11m
2024-09-16
2024-09-19
2d 10h 3m
2024-09-13
2024-09-16
2d 18h 28m
2024-09-07
2024-09-10
3d 8h 40m
2024-08-25
2024-08-27
2d 6h 12m
2024-08-16
2024-08-24
8d 18h 52m
2024-07-26
2024-07-30
3d 23h 19m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Pantelleria East
2024-11-21
Ankommen
El-Jazair
2024-11-21
Abfahren
Sizilien
2024-11-21
Ankommen
Isla de Alboran
2024-11-18
Ankommen
Strait of Gibraltar
2024-11-18
Abfahren
Dover
2024-11-14
Ankommen
Calais
2024-11-14
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Main engine problem off Rame Head

Fri Feb 24 10:08:00 CET 2023 Timsen

The 'Oslo Wave 3', en route from Hamina to Bejaia with 13 crew members and 11400 metric tonnes of timber as cargo on board, suffered a problem with the thermal oil in the main engine in pos. 49 37 00 N, 004 03 01 W, 44,2 nautical miles off Rame Head on Feb 22, 2023, at around 10 a.m. UTC. At 12.40 p.m. the defect had been repaired, and the vessel continued the voyage with an ETA as of Feb 27.

Cargo ship suffered pump damage

Fri Mar 01 10:49:18 CET 2019 Timsen

The "Oslo Wave 3", en route from Oulu to Alexandria suffered a crack in its lube oil pipe in the engine room in position 51 13 06 N, 001 44 03 E on Feb 28, 2019, at 2.10 a.m. The vessel was disabled due to the subsequent lack of engine power. The crew conducted repair works which were completed by 07.45 a.m., and the ship resumed its voyage, ETA March 11.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data