Allgemeine Informationen

IMO:
9306718
MMSI:
256049000
Rufzeichen:
9HZV7
Breite:
25.0 m
Länge:
164.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Malta
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
239.1° / -12.0
Kompasskurs:
235.0° / -12.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Mediterranean Sea
Zuletzt empfangen::
2024-11-25
vor 1 Std
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-24
2024-11-24
15h 4m
2024-11-21
2024-11-22
22h 1m
2024-11-19
2024-11-19
7h 24m
2024-11-18
2024-11-18
4h 54m
2024-11-15
2024-11-16
20h 49m
2024-11-12
2024-11-13
1d 6h 18m
2024-11-10
2024-11-10
14h 32m
2024-11-09
2024-11-09
11h 13m
2024-11-08
2024-11-08
8h 4m
2024-11-07
2024-11-07
9h 58m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Fos Approach
2024-11-19
Ankommen
Fos-sur-Mer
2024-11-19
Ankommen
Fos-sur-Mer
2024-11-19
Abfahren
Fos Approach
2024-11-19
Abfahren
Isla de Alboran
2024-11-17
Ankommen
Strait of Gibraltar
2024-11-16
Abfahren
Strait of Gibraltar
2024-11-15
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Vehicles carrier allided with quay and crane in Koper

Fri Jun 09 09:46:02 CEST 2017 Timsen

On June 7, 2017, the "Neptune Thelisis", which had arrived from Piräus at 9 a.m., allided with a quay at Luka Koper. The ship had been moored at the quay when a severe storm struck the area. The strong winds with gusts reaching 110 kilometers per hour slammed against the car carrier. The winds were strong enough to pull it away from the pier, snapping the bow mooring lines. The ship then swung around and struck against the quay and a gantry crane which fell over and was completely demolished. The vessel only sustained multiple scratches and minor damage. Damage by the storm was reported to be between 15 to 20 million €. The "Neptune Thelisis" remained in port to be surveyed for hull damage and complete repairs. Both the harbour authority and the vessel’s owners deny responsibility for the incident and litigation was expected. Reports with photos and video: http://primorske.si/Novice/Istra/V-tretji-nesreci-na-istem-privezu-je-padlo-se-dvig http://novice.najdi.si/predogled/novica/b62490532476e83885b83dfc8a4556e1/Planet-si/Slovenija/VIDEO-Huda-ura-v-Luki-Koper http://novice.najdi.si/predogled/novica/668a7816390b652e239a7ce66535736c/Regional-Obala/Obala-Kras-in-Notranjska/LADJAR-OBTO%C5%BDUJE-LUKO-Ve%C4%8Dmilijonska-%C5%A1koda-dve-podobni-nesre%C4%8Di-%C5%BEe-prej-VIDEO http://novice.najdi.si/predogled/novica/18a5d75e7a95f4e35e9d87b63294aa92/Regional-Obala/Obala-Kras-in-Notranjska/NO%C4%8CNA-MORA-V-LUKI-KOPER-Odtrgala-se-je-ladja-in-zru%C5%A1ila-dvigalo-FOTO-VIDEO

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data