MERLIN
Kurs/Position
vor 103 Tagen
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Salvage completed
The "Merlin" was finally pulled away on Oct 23 and moored in the harbour basin 1 in Basel after a salvage of 12 days. Swiss report with photo: http://bazonline.ch/basel/stadt/Hier-liegt-die-Merlin-im-sicheren-Hafen/story/13612564
Wreck turned upright
The "Merlin" finally has been turned upright until the evening of Oct 21. Salvage work was then interrupted due to an upcoming storm and the wreck secured. Next the still flooded hull was to be dewatered and the ship investigated by the Swiss prosecutors. Swiss report with photos: http://bazonline.ch/basel/stadt/Die-Merlin-ist-gedreht/story/30455614
Salvage work resumed
The "Merlin" was turned into a position with still a bit more than 90 degrees list on Oct 17. The salvage work had been resumed in the morning after an interruption of two days. Swiss report with photos: http://www.20min.ch/schweiz/basel/story/Merlin-Bergung---Jetzt-gehts-wirklich-los---22660699
News schreiben