Amsterdam

Allgemeine Informationen

Name:
Amsterdam
Land:
Netherlands
UN/Locode:
NLAMS
Local time:
Festgemachte Schiffe:
948
Erwartete Schiffe:
115
Liegeplätze:
121
Koordinaten:
N 52° 25' E 004° 49'

Festgemachte Schiffe

Name
Type
Moored
Sportboot
19.12. 12:42
Frachtschiff
21.12. 15:31
Tanker
21.12. 04:30
Tanker
28.11. 07:04
Frachtschiff
20.12. 13:21
Tanker
21.12. 11:23
Passagierschiff
21.12. 14:01
Tanker
21.12. 15:56
Tanker
20.12. 01:14
Frachtschiff
16.12. 03:44

Erwartete Schiffe

Name
Typ
Erwarted
Frachtschiff
21.12. 19:00
Tanker
21.12. 20:30
Tanker
22.12. 02:00
Tanker
22.12. 03:00
Tanker
22.12. 11:00
Frachtschiff
22.12. 13:00
Tanker
22.12. 15:00
Frachtschiff
23.12. 00:00
Frachtschiff
23.12. 06:00
Tanker
24.12. 03:00

Ausgelaufene Schiffe

Name
Typ
Ausgelaufen
Frachtschiff
21.12. 17:04
Unklassifiziert
21.12. 15:42
Tanker
21.12. 13:53
Tanker
21.12. 13:37
Frachtschiff
21.12. 13:12
Frachtschiff
21.12. 12:34
Tanker
21.12. 09:35
Frachtschiff
21.12. 04:46
Tanker
21.12. 00:10
Tanker
21.12. 00:02

Die neuesten Nachrichten

Port of Amsterdam Doubles Discount for Green Ships

Sun Aug 05 21:41:32 CEST 2018 arnekiel

Port of Amsterdam said the maximum Environmental Ship Index (ESI) discount is doubled for ships with ESI certificates and liquefied natural gas (LNG). For some years Port of Amsterdam has been giving discounts on port dues to vessels listed in the ESI that have attained an ESI score of 20 points or higher. "As of 1 August, we will be increasing this incentive by adding another discount: Port of Amsterdam will be doubling the maximum ESI discount for vessels that are in the possession of an ESI certificate and use LNG for their main engine or auxiliary engine," said a press release.

Amsterdam: Carbon emissions in North Sea Canal Area to be reduced by half by 2030

Sun Jul 22 20:17:12 CEST 2018 arnekiel

Industrial companies based in the North Sea Canal Area seek to cut carbon emissions by 50% by 2030, bringing them down from the current level of 15 megatons. Virtually all circular waste flows must be recycled by 2050 and carbon emissions minimised. In committing to these targets, the area aims to be among the leading regions in Europe when it comes to reducing climate change.

The New Sea Lock – what’s happening in June?

Sat Jun 09 10:34:41 CEST 2018 arnekiel

The construction of the lock gate chamber of the outer head (number 1 in the picture) is scheduled for near completion in June. The diaphragm walls for the guard walls (numer 2 in the picture) will also be constructed this month, just like the flood defence between the new sea lock and the North Lock (number 3 in the picture). Outer head lock gate chamber This month, the outer head lock gate chamber will get close to its final dimensions. With its four metres thick floor, the underside of which lies at 5 metres below NAP (Amsterdam Ordnance Datum) and its six metres thick walls with a height of 17 metres above NAP, it surely is an impressive structure. Its total floor area is 26 by 80 metres. Once the required dimensions are reached, preparations can be made to sink the outer head lock gate chamber; this sinking operation is planned for later in the summer. https://www.hellenicshippingnews.com/the-new-sea-lock-whats-happening-in-june/

News schreiben