JONDAL
Kurs/Position
vor 1340 Tagen
Die letzten Häfen
Die letzten Wegpunkte
Die neuesten Nachrichten
Ferry sidelined due to technical trouble
Ferry operator Norled had to withdraw the "Jondal" from the Utne-Kinsarvik route on June 8, 2016, due to technical trouble, unutil further notice. Vehicles queued at the detour route to Kvam and was directed over the E 16 and Fv7.
Allision in Utne
On July 25, 2013, the "Jondal" slammed into the dock at Utne, Hordaland, around 6 p.m. Several people were injured, but none serious. The ferry had suffered technical problems to its propeller before hitting the quay. Two ambulances and the fire rescue were on scene. Norwegian report with photo: http://www.vg.no/nyheter/innenriks/artikkel.php?artid=10118612
Ferry disruption affects fish transport
The "Jondal" was out of service on June 10, 2011, due to technical problems. This affected especially Grieg Seafoods at Judaberg who usually send off up to ten trucks per day with salmon going to Asia and Europe and feared this would not reach the airport because in time. An oil pipe was ruptured and had to be repaired in a yard. By 2.15 p.m. repairs were expected to be completed and the ferry would start a trip to Eidssund and return to Judaberg, however, with delays.
News schreiben