Allgemeine Informationen

IMO:
9247924
MMSI:
247080200
Rufzeichen:
IBZE
Breite:
34.0 m
Länge:
197.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Italy
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
221.8° / 0.0
Kompasskurs:
64.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Vigo (Vigo Port)
Gebiet:
Spain
Zuletzt empfangen::
2025-03-28
vor 6 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor < 1 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-03-27
1d 14m
2024-10-30
2025-03-27
147d 14h 24m
2024-10-25
2024-10-27
1d 15h 6m
2024-10-24
2024-10-24
7h 52m
2024-10-19
2024-10-23
3d 2h 23m
2024-10-18
2024-10-19
22h 32m
2024-10-14
2024-10-15
12h 34m
2024-10-09
2024-10-11
2d 13h 54m
2024-10-02
2024-10-03
16h 12m
2024-09-29
2024-09-30
20h 16m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Isle of Scilly
2024-10-27
Ankommen
Isle of Scilly
2024-10-24
Abfahren
Dover
2024-10-23
Ankommen
Calais
2024-10-23
Ankommen
Wandelaar
2024-10-23
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Vehicles carrier completed trials after repair

Fri Mar 28 12:26:39 CET 2025 Timsen

On March 27 at 10:10 a.m., the 'Grande Napoli' left its berth at the Transatlantic Dock in Vogo, escorted by the tugs 'Helechosa' and 'Pilot Two'. The activity began early, with the closure of the vessel's ramps and the activation of its radar and communication antennas, as the ship was preparing to set sail. At 11:07 a.m., the ship left the Vigo Estuary and started its sea trials. These maneuvers took it close to the coast of Baiona, where the ship tested its systems and capabilities for several hours. After completing its trials, the ship began its return to Vigo at 6:00 p.m. , but instead of returning to the Transatlantic Liner Dock, where it had been docked for the past five months, the 'Grande Napoli' headed for the Bouzas Dock. At approximately 7:45 p.m., the ship was moored and is now preparing to finally depart Vigo. Its departure was scheduled for March 29, at 2:00 p.m. Report with photos: https://www.vigoe.es/vigo/maritima/el-grande-napoli-se-despide-de-vigo-por-unas-horas/

Vehicles carrier needs additional testings after engine breakdown

Thu Mar 27 11:32:04 CET 2025 Timsen

As of March 26, 2025, the 'Grande Napoli' remained berthed in Vigo at the Ocean Liner Dock, amid uncertainty and delays. The ship had suffered an engine failure on Oct 29, 2024, and had to be towed into the port, where it has been stationary since. After repairs, its departure was initially scheduled for March 25, but it has been postponed due to the need for additional technical testings. On March 27 at 10 a.m. UTC the ship left the port. Report with photo: https://www.vigoe.es/vigo/maritima/el-grande-napoli-sigue-anclado-en-vigo-incertidumbre-y-retrasos/

Vehicles carrier suffered breakdown off Viana do Castelo

Thu Nov 07 12:46:28 CET 2024 Timsen

The 'Grande Napoli' suffered an engine failure on Oct 29, 2024, about 28 nautical miles west of Viana do Castelo, en route from Portbury (Bristol) to Setúbal. The tug  "Ría de Vigo" (IMO: 8311417) was deployed to the ship in the night- On the morning of Oct 30, the ships were in pos.  41° 36' N 009° 12' W with status restricted movement. The ship was finally towed into the port of Vigo at 7 p.m.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data