Allgemeine Informationen

IMO:
9191175
MMSI:
255735000
Rufzeichen:
CQSW
Breite:
17.0 m
Länge:
100.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Tankship
Ship type:
Flagge:
Portugal
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
23.4° / -11.0
Kompasskurs:
23.0° / -11.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
North Sea
Zuletzt empfangen::
2024-12-27
vor 1 Std
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Std
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-12-24
2024-12-25
1d 5m
2024-12-19
2024-12-20
1d 7h 56m
2024-12-12
2024-12-16
3d 22h 18m
2024-12-09
2024-12-10
1d 6h 34m
2024-12-05
2024-12-07
1d 23h 47m
2024-11-30
2024-12-01
1d 5h 31m
2024-11-27
2024-11-28
1d 5h 9m
2024-11-26
2024-11-26
45m
2024-11-25
2024-11-26
4m
2024-11-25
2024-11-25
57m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Den Helder
2024-12-26
Ankommen
Hook of Holland
2024-12-25
Abfahren
Dirkzwager Maassluis
2024-12-25
Ankommen
Dirkzwager Maassluis
2024-12-24
Abfahren
Hook of Holland
2024-12-24
Ankommen
Bassrock
2024-12-20
Abfahren
Bassrock
2024-12-18
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Engine failure in Kiel Canal

Fri Jan 27 09:20:41 CET 2017 Timsen

Enroute from Bützfleth to Klaipeda the "Georg Essberger" suffered an engine failure during the transit of the Kiel Canal on Jan 26, 2017, at 7:45 a.m. The ship had just left the large Southern lock in Brunsbüttel Eastbound when the trouble occurred. The master informed the other ships that the ship was unmanoeverable and he was trying to reach the navy pilings North in the inner port of Brunsbüttel with the remaining speed. The crew managed to tie up the tanker at the pilings, and after repairs were carried out, the ship resumed the voyage at 8.40 p.m. with an ETA in Klaipeda as of Jan 27, 9 p.m.

Tanker allided with Stena quay

Tue Jan 19 22:13:28 CET 2016 Timsen

The "Georg Essberger" suffered an engine blackout on the New Waterway near Hoek van Holland in the afternoon of Jan 19, 2016, and allided with a quay of a Stena Line terminal in spite of an emergency anchoring manoever. The ship was underway from the Botlek in Rotterdam to the Northsea and suffered bow damage. The tanker was towed back to the STR terminal in Rotterdam and entered the Damen Shiprepair yard in Rotterdam on Jan 22 for repairs of the damage. Dutch reports with photos: http://www.rijnmond.nl/nieuws/137332/Tanker-botst-tegen-kade-Hoek-van-Holland http://koopvaardij.blogspot.de/2016/01/zeeschip-in-de-problemen.html

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data