Allgemeine Informationen

IMO:
9913286
MMSI:
219028133
Rufzeichen:
OYQL2
Breite:
31.0 m
Länge:
115.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
High-Speed Craft
Ship type:
Flagge:
Denmark
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
357.6° / 0.0
Kompasskurs:
175.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Roenne (Rönne Port)
Gebiet:
Denmark
Zuletzt empfangen::
2025-02-02
vor 7 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2025-02-01
6h 4m
2025-02-01
2025-02-01
32m
2025-02-01
2025-02-01
36m
2025-02-01
2025-02-01
35m
2025-02-01
2025-02-01
37m
2025-02-01
2025-02-01
37m
2025-02-01
2025-02-01
45m
2025-02-01
2025-02-01
36m
2025-01-31
2025-02-01
8h 40m
2025-01-31
2025-01-31
39m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Oresund Bridge
2024-12-17
Ankommen
Landskrona
2024-12-17
Ankommen
Helsingborg
2024-12-17
Ankommen
Helsingborg
2024-11-30
Abfahren
Landskrona
2024-11-30
Abfahren
Oresund Bridge
2024-11-30
Abfahren
Oresund Bridge
2023-11-26
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Ferry due to return before christmas traffic

Thu Dec 12 18:45:11 CET 2024 Timsen

The 'Express 5' is expected to be ready for deployment on the afternoon of Dec 17. An internal investigation has determined that it was human error that caused the ferry to hit the port facility on its way out on the last double trip of the day on Nov 25. The ferry subsequently had to turn around and disembark its passengers in Rønne again. While the 'Express 5' has been under repair, the 'Express 1' has served as the main ferry on the route.

Return date fixed

Wed Dec 11 11:16:09 CET 2024 Timsen

The 'Express 5' will leave the dock at the Fayard Yard on Dec 16 after completion of repairs, and it is expected to arrive in port in Rønne around midnight that night. The ferry will then be made ready to resume operations the same day in the afternoon. Actually, the welding work has almost been finished, which means that the yard can start on some of the other tasks. One of them is to paint the ferry including the ship'sbottom. The paint is very important in relation to the ship's ability to slide through the water and reduce the consumption of fuel. It is a special silicone paint that must be applied with great care, in dry conditions and at a certain temperature. The bottom painting is a slow process with many layers and long drying times between the layers.

Human error behind allision in Rønne

Wed Dec 04 09:53:23 CET 2024 Timsen

On Nov 30 the 'Express 5' entered the Fayard Yard in Munkerbo/Odense for permanent repairs and remained stationary as of Dec 4. There was no information on when the repairs will be completed. The 'Express 1' is actually serving as the main ferry on the route. Meanwhile it has turned out that it was a human error that caused the allision with the so-called Flis Quay during the departure from Rønne on the evening of Nov 25, an internal investigation of the incident by the Bornholm line showed. The ferry was seriously damaged due to the hard contact with the pier. No technical causes have been found. Since the weather was normal, the incident has been categorized as human error in the accident report, which has now been submitted to the Danish Maritime Authority.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data