Allgemeine Informationen

IMO:
MMSI:
244780281
Rufzeichen:
PA3065
Breite:
6.0 m
Länge:
26.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
360.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Lauwersoog (Lauwersoog Port)
Gebiet:
Netherlands
Zuletzt empfangen::
2024-11-28
vor 1 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-09-19
69d 18h 9m
2024-09-19
2024-09-19
11m
2024-09-13
2024-09-19
5d 22h 43m
2024-09-12
2024-09-12
3h 44m
2024-09-10
2024-09-12
1d 16h 8m
2024-09-10
2024-09-10
3h 33m
2024-09-10
2024-09-10
15m
2024-06-23
2024-09-09
78d 2h 49m
2024-06-21
2024-06-22
19h 32m
2024-06-13
2024-06-21
7d 20h 26m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Delfzijl
2024-06-22
Abfahren
Delfzijl Gateway
2024-06-22
Abfahren
Fischerbalje
2023-09-17
Ankommen
Fischerbalje
2023-09-15
Abfahren
Terschelling
2023-06-22
Ankommen
Delfzijl
2022-11-27
Abfahren
Delfzijl Gateway
2022-11-27
Abfahren
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Eco-ship reached Aruba

Sun Jan 20 23:00:44 CET 2013 Timsen

Wubbo Ockels reached Oranjestad in Aruba on Jan 20, 2013, after a voyage of 2,5 months aboard the "Ecolution". Minister Ronald Plasterk and the prime Minister Mike Eman welcomed the former Astronaut who said there were few problems during the voyage after the boat had suffered problems with broken cables at the keel short after its departure off France.

Ecolution still in Brest, waiting for inspection

Sun Nov 18 19:01:30 CET 2012 Timsen

The "Ecolution" is still in the port of Brest and must be taken out of the water for an inspection of the keel. But the local yard has time only on Dec 3. Owner Wubbo Ockels is now looking for another place to get the boat out of the water to see if there is a dent on the front of the keel box which is a vulnerable point. The crew had planned to spend Christmas in Aruba which would have meant that the ship would reach the Canary Islands around Dec 2-3. There is still a little time. Before the "Ecolution" starts its crossing of the Atlantic, all problems are to be solved. The crew has already replaced all keel cable with a special cord so they can operate the keel and pick him up.

Ockels stranded in Newhaven

Wed Nov 07 09:59:59 CET 2012 Timsen

Already on its second day into the voyage to Aruba the "Ecolution" got stranded in Newhaven, UK, on Nov 6 after suffering engine problems. By unknown cause, water had poured into the diesel engines. Volunteers from Newhaven’s RNLI lifeboat station were launched on Nov 6 at 5 p.m. to the ship which was disabled in choppy conditions seven miles south of Newhaven. The skipper had shut down both engines and called the Coastguard for assistance. Newhaven’s all-weather Severn Class lifeboat "David and Elizabeth Acland" arrived on scene with the stricken vessel at 5.37 p.m. A tow was established after about 30 minutes and the casualty, with eight crew on board, was slowly towed towards Newhaven. The vessel was safely towed into Newhaven harbour and moored on the east quay at approximately 8.30 p.m. Apart from this mishap, Ockels was satisfied with the achieved success and said, the "Ecolution" was much faster than expected and was sailing great. Report with photo: http://rnli.org/NewsCentre/Pages/Newhaven-Lifeboat-launched-to-a-26-metre-twin-mastered-schooner-with-engine-fail.aspx

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data