Allgemeine Informationen

IMO:
9559872
MMSI:
305749000
Rufzeichen:
V2FP5
Breite:
16.0 m
Länge:
132.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Antigua and Barbuda
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
316.8° / 0.0
Kompasskurs:
247.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Rio de Janeiro (Rio de Janeiro)
Gebiet:
Brazil
Zuletzt empfangen::
2024-12-26
vor 5 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 16 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-12-22
4d 2h 38m
2024-12-17
2024-12-19
2d 4h 1m
2024-12-12
2024-12-16
4d 2h 9m
2024-11-18
2024-11-21
2d 21h 52m
2024-11-16
2024-11-17
1d 3h 59m
2024-10-24
2024-11-14
21d 9h 11m
2024-10-20
2024-10-22
2d 1m
2024-10-17
2024-10-18
1d 2h 17m
2024-09-18
2024-09-20
1d 18h 5m
2024-09-12
2024-09-14
2d 11h 39m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
Dover
2024-11-22
Ankommen
Calais
2024-11-22
Ankommen
Wandelaar
2024-11-21
Ankommen
Vlissingen
2024-11-21
Ankommen
Hinweis: Alle Zeiten in UTC

Die neuesten Nachrichten

Repairs nearly completed

Fri Apr 20 09:55:08 CEST 2018 Timsen

Repairs to the "BBC Nagasaki" which had sustained a main engine breakdown while departing from Orkanger on Feb 21 were soon to be completed. The vessel had been owed to Trondheim Trials on March 2. Trials and tests were completed on Apr 23.

Disabled vessel under tow to repair yard

Fri Mar 02 18:20:48 CET 2018 Timsen

On Feb 21, 2018, the "BBC Nagasaki", sailing in ballast, sustained a main engine breakdown while departing from Orkanger. The damage was reported to main engine crankshaft. Two tugs re-berthed the vessel at Orkanger. Engine repairs starte alongside at Orkanger On March 2 the ship was taken in to the Fosen Mek. Verksted A/S in Trondheim by the Norwegian tug "TB Oyvag" (IMO: 5255129) at 5.30 p.m. where repairs started to the damage at the main engine crankshaft. A new crankshaft for the main engine will have to be installed. The estimated time repair completion was now the first week of April.

Thor Commander towed to Gladstone

Thu Jan 15 11:10:36 CET 2015 Timsen

The "Thor Commander" arrived in Gladstone on Jan 15 at 7 a.m. on Thursday and has docked at Auckland Point wharf with the assistance of the tug "Smit Leopard" after having suffered a main engine failure on Jan 11. The ship, originally destined for Townsville, was being towed to Gladstone by the Gladstone-based tug afterit left its base on Jan 12 in the morning and attached a line to the ship on Jan 12 afternoon. Now repairs to the engine were to be done.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data