Allgemeine Informationen

IMO:
9703215
MMSI:
316030213
Rufzeichen:
CFA2686
Breite:
26.0 m
Länge:
92.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Canada
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
304.1° / 0.0
Kompasskurs:
32.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Gebiet:
St. Lawrence River
Zuletzt empfangen::
2024-11-22
vor 3 Min
Source:
T-AIS
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 154 Tagen
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Port
Arrival
Departure
Duration
2024-11-21
11h 20m
2024-11-21
2024-11-21
13m
2024-11-21
2024-11-21
11m
2024-11-21
2024-11-21
10m
2024-11-21
2024-11-21
12m
2024-11-21
2024-11-21
12m
2024-11-21
2024-11-21
12m
2024-11-21
2024-11-21
12m
2024-11-21
2024-11-21
11m
2024-11-21
2024-11-21
10m
Hinweis: Alle Zeiten in UTC

Die letzten Wegpunkte

Waypoints
Time
Direction
-
-
-

Die neuesten Nachrichten

Ferry suffered mechanical trouble

Thu Jun 18 23:08:19 CEST 2020 Timsen

The 'Armand Imbau II' suffered a mechanical failure on June 17, 2020, which could be rectified. On June 18 the same malfunction occurred again, and the ferry was sidelined in Tadoussac and will not be in operation until further notice. Departures will therefore take place every 40 minutes from at the Tadoussac-Baie-Sainte-Catherine crossing.

Azipod failure

Fri Dec 13 19:31:08 CET 2019 Timsen

The 'Armand Imbeau II' suffered an aft azipod failure in position 48 08 20.7 N, 069 43 36.6 W, on Dec 12, 2019, at 5 a.n. The vessel proceeded to the lay-up berth in Tadoussac, Quebec, Canada, where the crew carried out repairs. The ferry sailed from Tadoussac at 6.50 p.m. after repairs.

Ferry suffered technical glitch

Thu Sep 05 10:15:04 CEST 2019 Timsen

Only one ferry remained in service since Aug 30, 2019, at noon on the Tadoussac-Baie-Sainte-Catherine crossing following a breakdown of an electronic module aboard the "Armand-Imbeau II". The crossings take place all 40 minutes on each side of the Saguenay River. The Société des traversiers du Québec hoped to have the trounbe resolved on Sep 1 with repairs immediately started.

News schreiben

Durchschnittsgeschwindigkeit pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

zurückgelegte Strecke pro Tag

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Ship master data