General information

IMO:
8881682
MMSI:
Callsign:
5VBE4
Width:
24.0 m
Length:
154.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Togo
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
0.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Saint Nazaire (Chantiers de l’Atlantique- Berth Area 01)
Area:
France
Last seen:
2015-01-26
3588 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3588 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2014-11-17
2015-01-27
70d 9h 20m
2013-12-09
2013-12-09
2013-10-10
2013-10-10
2013-09-03
2013-09-03
2013-09-02
2013-09-02
2013-09-02
2013-09-02
2013-08-30
2013-08-30
2013-08-28
2013-08-28
2013-08-23
2013-08-23
2013-08-22
2013-08-22
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

The end of a seven year's saga

Tue May 03 10:52:24 CEST 2016 Timsen

Seven years after the arrival in the port of Saint-Nazaire, the "Aspet", which later became the "Zortürk", is finally being demolished. The bulker had suffered water ingress in July 2009 while en route from Hull to Lisbon and was diverted to the Loire port to shelter. The ship has never left since. It always had a registered owner, a longtime core crew and was even bought by a Turkish owner. Reclamation work has even been undertaken by its new owner. But the ship was found unfit to sail to sea by the Commercial Court of Saint-Nazaire and it was only in 2014 that a Memorandum of Understanding was signed between the port and the owner. With the Prefecture in September 2014 authorizing the dismantling of the ship in the dry dock of Saint Nazaire, work started to find a provider for the dismantling of the "Zortürk". On February 2016, the company Séjourné (Veolia) was selected and started two months later. Actually cutting of the superstructure is underway, followed by the removal of the engine block before proceeding to the hull itself. The work should be completed in July. The dock can then return to its original destination, mainly ship repair and shipbuilding. French reports and photos: http://www.ouest-france.fr/pays-de-la-loire/saint-nazaire-44600/saint-nazaire-le-demantelement-du-zorturk-commence-4202951 http://meretmarine.com/fr/content/saint-nazaire-debut-du-demantelement-du-zorturk http://www.shipspotting.com/gallery/photo.php?lid=2451349# http://www.shipspotting.com/gallery/photo.php?lid=2452148

Being broken up...

Mon May 02 09:27:41 CEST 2016 Timsen

...at St. Nazaire: http://www.shipspotting.com/gallery/photo.php?lid=2451349

broken up

Tue Apr 26 18:46:57 CEST 2016 BerndU

broken up at St. Nazaire 04/2016

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data