General information

IMO:
9350721
MMSI:
277408000
Callsign:
LYTD
Width:
26.0 m
Length:
199.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Lithuania
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
259.9° / 0.0
Heading:
258.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Baltic Sea
Last seen:
2024-12-22
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-21
2024-12-21
3h 22m
2024-12-20
2024-12-20
4h 27m
2024-12-19
2024-12-19
3h 42m
2024-12-18
2024-12-18
4h 58m
2024-12-17
2024-12-17
4h 42m
2024-12-15
2024-12-16
23h 44m
2024-12-14
2024-12-14
4h 35m
2024-12-13
2024-12-14
4h 21m
2024-12-12
2024-12-12
3h 29m
2024-12-11
2024-12-11
4h 30m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Klaipeda
2024-12-21
Leave
Klaipeda
2024-12-21
Enter
Mecklenburg Bay
2024-12-21
Leave
Fehmarn Nord
2024-12-21
Enter
Kiel Pilot
2024-12-20
Leave
Kiel Laboe
2024-12-20
Leave
Kiel Laboe
2024-12-20
Enter
Note: All times are in UTC

Latest news

Vicotria Seaways to be repaired within the forthcoming four days

Thu Apr 25 09:09:08 CEST 2013 Timsen

While experts were still searching for the reason why a truck aboard the "Victoria Seaways" caught fire, setting others alight too, off Bornholm on Apr 23, repairs were already going ahead in the port of Klaipeda. The ship will return to service on Apr 28, missing only two round trips Kiel-Klaipeda. The British cargo ferry "Corrona Seaways", (IMO: 9357597), will be inserted as a replacement to cover the cargo transport from Kiel to Klaipeda. Danish report with photo: http://www.maritimedanmark.dk/?Id=18682

Fire on DFDS-ferry

Tue Apr 23 12:17:36 CEST 2013 Timsen

In the night of Apr 23, 2013, a fire broke out aboard the "Victoria Seaways", while the ship was near Bornholm route from Kiel to Klaipeda. The fire was remarked on the ship's main deck at 0:52 a.m., when the ship was about 22 nautical miles from Nexø. The fire extinguishing system was activated and the crew gained quick control of the fire. At the same time the passengers were gathered at the ship assembly stationer to be evacuated from there if necessary. After about one hour the fire was contained, and the ship proceeded to Klaipeda where it wasexpected to arrive at 12:30 a.m. On board were 301 passengers and 37 crew members as well as 160 trailers, containers, trucks, 48 cars and two buses. The extent of damage of goods and vehicles on the car deck could not yet be assessed. None other than the main deck, which is a closed vehicle deck, was affected by the fire. Some cargo units were damaged. For the necessary surveys the whole cargo first had to be unloaded. The return trip to Kiel was cancelled. German report with photo: http://www.mv-online.de/Region-Rheine/Rheine/Brand-auf-Ostseefaehre-verlaeuft-glimpflich-Auch-die-Litauenhilfe-hatte-vor-zweieinhalb-Jahren-ein-aehnliches-Erlebnis-Osteuropahilfe-geraet-in-Seenot

Medevac off Fehmarn

Fri Oct 19 10:06:34 CEST 2012 Timsen

A Super-Puma helicopter of the Federal Police Bad Bramstedt medevaced a 18-year old passenger of the "Victoria Seaways“, which was underway frmo Klaipeda to Kiel at that time, on Oct 18, 2012 at noon. He was transported to a hospital in Lübeck. The helicopter was by chance on a surveillance flight when he was notified by the MRCC Bremen about the emergency. The patient was in a critical state so that the ferry crew did not want to wait for the scheduled arrival in Kiel at 4 p.m. and alarmed the DGzRS thus which requested the helicopter crew to suspend its mission and head for the ferry which was east of Fehmarn at that time. The "Victoria Seaways“ continued to Kiel and docked at 4 p.m. as scheduled.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data