General information

IMO:
9618965
MMSI:
538004484
Callsign:
V7XH8
Width:
37.0 m
Length:
228.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Marshall Islands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Restricted movement
Course:
351.2° / -6.0
Heading:
160.0° / -6.0
Speed:
Max speed:
Status:
waiting
Area:
SOUTH ATLANTIC OCEAN
Last seen:
2024-06-16
136 days ago
 
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
157 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-04-08
2024-04-23
15d 6h 13m
2022-01-13
2024-03-15
792d 7h 38m
2020-08-07
1545d 12h 29m
2020-03-19
2020-03-28
9d 5h 28m
2017-10-29
2018-03-02
123d 23h
2017-07-22
2017-07-31
8d 23h 22m
2017-06-07
2017-07-07
29d 22h 1m
2016-05-30
2016-10-21
144d 5h 25m
2016-03-18
2016-05-22
64d 18h 30m
2015-05-03
2016-02-28
300d 10h 12m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Canary Islands
2020-03-19
Enter
Strait of Gibraltar
2020-03-14
Enter
Isla de Alboran
2020-03-14
Leave
Sizilien
2020-03-10
Leave
Pantelleria East
2020-03-10
Leave
Kreta
2020-03-08
Leave
Note: All times are in UTC

Latest news

Total terminates Ensco drillship contract

Mon Aug 22 09:24:43 CEST 2016 arnekiel

Offshore Driller Ensco has received a notice of early termination from Total for drillship Ensco DS-7, effective from around early in the fourth quarter of 2016 based on the Total’s current well program. Total hired the drillship in the fourth quarter of 2013 at an initial day rate of around $610,000. Total is obligated to pay Ensco daily termination fees through to November 2017 as well as a demobilization fee. For the first 90 days following the early fourth quarter 2016 effective date, the daily termination fee is equal to the operating day rate of approximately $585,000. For the remaining term through November 2017, the daily termination fee is equal to 75% of the operating day rate. Daily termination fees payable by Total will be defrayed during any period that Ensco contracts the rig to a third party through November 2017. http://splash247.com/total-terminates-ensco-drillship-contract/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data