General information

IMO:
9013220
MMSI:
Callsign:
IQSU
Width:
12.0 m
Length:
61.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Italy
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
346.8° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Livorno (Livorno Dry Docks)
Area:
Tyrrhenian Sea
Last seen:
2015-04-07
3551 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3551 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2014-11-30
2015-04-08
128d 7h 50m
2014-11-29
2014-11-30
11h 41m
2014-11-11
2014-11-13
1d 19h 21m
2014-11-03
2014-11-04
1d 11h 23m
2014-10-20
2014-10-21
1d 8h 46m
2014-10-19
2014-10-19
7m
2014-10-12
2014-10-14
1d 22h 57m
2014-10-03
2014-10-03
9h 12m
2014-09-28
2014-09-30
1d 19h 58m
2014-09-19
2014-09-19
3h 17m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Wreck to be demolished years after sinking

Fri Jul 06 12:18:26 CEST 2018 Timsen

The Port Authority of Livorno has authorized the demolition of the "Urania". The wreck of the oceanographic reseach vessel has blocked the basin "Mediterraneo" since it sank on Au 25, 2015. The floating dock was unusable due to the judicial seizure and, after the release, for the issues among all the interested parties, including insurance. With the decision of the Port Authority after the work of mediation and finishing with all the interested parties - the demolition could start in about two weeks directly in the basin. The cut down metal will be transferred by trucks for recycling. The work should last about a month.

Bangladesh Coast Guard takes delivery of last OPV duo "Urania" and "Danaide" from Fincantieri

Mon Oct 16 22:49:04 CEST 2017 arnekiel

Fincantieri today has delivered at its shipyard in Muggiano (La Spezia) the last two units part of the supply contract of four Offshore Patrol Vessels (OPV), to the Bangladesh Coast Guard (BCG), through the upgrading and conversion of the “Minerva” class corvettes, decommissioned by the Italian Navy, the shipbuilding group said in a press release. These are the "Urania" and "Danaide" vessels, renamed “KARAMUZZAMAN” and “MANSOOR ALI”, which have been retired from the national fleet in March 2016 and shortly after arrived at Fincantieri’s dock in Genova, where the upgrading and conversion activities started. The units have been completed at the Integrated naval shipyard of Muggiano (La Spezia). Attending the ceremony, among others, Mr Mostafa Kamal Uddin, Secretary to the Ministry of Internal Affairs of the People’s Republic of Bangladesh, Rear Adm. AMMM Aurangzeb Chowdhury, Director General of the Bangladesh Coast Guard, while Fincantieri was represented by Paolo Frino, Deputy Senior Vice President Fincantieri Services.

Research vessel to be removed

Tue Mar 14 10:55:52 CET 2017 Timsen

1,5 years after the "Urania" sank inside the floating dock "Mediterranean" in the port of Livorno, which cost the life of a worker of 38 years, was subject of a wreck removal process, so the authorities could begin to assess the damage. Work in the basin has been suspended since the accident. Italian report with photo: http://www.lanazione.it/livorno/cronaca/dissequestro-urania-1.2963727

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data