General information

IMO:
8010554
invalid
MMSI:
Callsign:
N0WS
Width:
37.0 m
Length:
83.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
n/a
Course:
331.0° / -5.0
Heading:
285.0° / -5.0
Speed:
Max speed:
Status:
moored
Location:
Rotterdam (Waalhaven Zuid)
Area:
Netherlands
Last seen:
2012-07-09
4520 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4520 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2012-02-14
4666d 3h 45m
2012-01-17
2012-01-21
3d 21h 30m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Boskalis awarded contract for Wikinger offshore wind farm

Mon Dec 22 08:14:29 CET 2014 arnekiel

Royal Boskalis Westminster N.V. (Boskalis) in partnership with Volker Stevin International (VolkerWessels) have been awarded a contract by Iberdrola Renewables Offshore Deutschland GmbH for the partial construction of the Wikinger Offshore Wind Farm in the German section of the Baltic Sea. The work comprises the transport and installation of seventy wind turbine foundations and six offshore substation piles. The contract carries a value of approximately EUR 75 million for Boskalis. The Wikinger Offshore Wind Farm is located 34 kilometers northeast of the island of Rügen and will generate a total capacity of 350 MW. Each of the seventy wind turbine foundations consists of a four-legged jacket and four piles that will be transported from four different locations in Europe to Sassnitz-Mukran in Germany by Boskalis barges and anchor handling tugs and Dockwise semi-submersible transport vessels. Following the transport from Sassnitz-Mukran to the wind farm the piles will be driven into the seabed after which the jackets will be installed and connected to the piles. The pile installation activities will be executed by a Boskalis Giant barge with a 1,000-tonne crane and the installation of the jackets by the Boskalis 2,200-tonne Taklift 4 sheerlegs. The project is scheduled to commence in the first quarter of 2016 with completion expected in the fall of 2016.

TAKLIFT 4 8010554

Sun Apr 18 00:42:11 CEST 2010 marshi

http://www.smit.com/equipment/www/pages/details.asp?EquipTypeId=3&EquipTypeName=Sheerlegs&EquipId=113 http://www.huismanequipment.com/en/products/cranes/floating_cranes

TAKLIFT 4 8010554

Sat Apr 17 23:15:52 CEST 2010 geisbok

is this a real ship or just an empty registration?

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data