General information

IMO:
9045974
MMSI:
308424000
Callsign:
C6QK2
Width:
38.0 m
Length:
242.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Bahamas
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
117.7° / 0.0
Heading:
134.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
Gulf of Thailand
Last seen:
2024-11-17
5 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 hours ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2014-05-07
2014-07-02
55d 18h 7m
2014-05-07
3853d 16h 17m
2014-05-01
2014-05-01
2014-04-29
2014-04-29
2014-04-25
2014-04-25
2013-11-26
2013-11-26
2013-08-10
2013-08-10
2013-01-16
2013-01-18
1d 18h 45m
2012-12-27
2012-12-29
1d 12h 52m
2012-12-19
2012-12-27
8d 5h 31m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Suksan Salamader FSO Receives First Oil at Bualuang Field OffshoreThailand

Thu Aug 21 10:23:54 CEST 2014 arnekiel

Salamander Energy plc announced Tuesday, August 19, that first oil has been received in the tanks of the newly converted Suksan Salamander Floating Storage and Offtake Vessel (FSO) at the Bualuang field in the Gulf of Thailand. This is the culmination of the planned upgrade to the field’s facilities which targets a reduction in operating costs of up to $25 million per annum. New power and processing modules were loaded out to the Bravo platform in the first half of the year. These have been operating smoothly since hook up and commissioning in May. The FSO arrived on location in July. Following hook up and commissioning the new FSO is now fully operational. As well as halving the day rate of the production vessel, these upgrades double water handling capacity, increase potential production rates and extend the productive life of the field. The Rubicon Vantage Floating Production, Storage and Offtake vessel will depart the field in the coming weeks. Salamander Chief Executive James Menzies commented: “We have upgraded production infrastructure in the Bualuang field on both time and budget. The new facilities enhance the value of the field, minimize the risk of future downtime and mean we are well positioned for the next phase in the field’s growth.” Source : Rigzone

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data