General information

IMO:
8764418
MMSI:
232020225
Callsign:
MEOY4
Width:
81.0 m
Length:
95.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
193.4° / 0.0
Heading:
193.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Vindenes (Vindenes Port)
Area:
North Europe
Last seen:
2024-12-22
3 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-11
2024-11-21
10d 1h 8m
2024-01-11
2024-01-27
15d 22h 23m
2023-05-04
2023-05-23
18d 22h 23m
2023-03-20
2023-04-30
41d 4h 15m
2022-02-02
2022-06-28
145d 6h 42m
2021-09-22
2021-11-23
62d 4h 12m
2020-07-03
2021-06-17
348d 7h 2m
2019-10-31
2020-02-19
110d 22h 34m
2019-03-11
2019-04-05
24d 22h 33m
2018-10-04
2019-02-28
146d 21h 45m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
St. Georges Channel
2022-01-27
Leave
St. Georges Channel
2021-12-02
Enter
Terneuzen Locks approach
2019-10-29
Leave
Terneuzen Locks approach
2019-10-25
Enter
Hook of Holland
2019-02-28
Leave
Note: All times are in UTC

Latest news

Damen Verolme Rotterdam Wins Refit Contract For Drilling Rig ‘STENA Don’

Sun Aug 05 14:00:55 CEST 2018 arnekiel

Damen Verolme Rotterdam (DVR), one of Damen Shipyards Group’s most experienced yards in the repair and refit of complex offshore structures, has been awarded a contract by Stena Drilling for a refit of its drilling rig Stena Don. The vessel will arrive at DVR in October 2018 and is expected to remain there for around three months. The most significant aspect of the works will be the installation of an eight-point mooring system prior to the rig being deployed off the UK’s Shetland Islands.

Stena Drilling rig handed early termination by Statoil

Wed Oct 26 09:46:16 CEST 2016 arnekiel

Noway’s Statoil has announced a decision to cancel the contract for Stena Drilling semisubmersible rig Stena Don. While the rig had been contracted through to February 2017, Statoil says that the cancellation will take effect once the rig completes plugging activity at its Troll field early November. Statoil says it doesn’t have any further activities where the rig can be utilised. Stena Don has been on contract to Statoil since February 2014, operating at the Troll and Fram fields. http://splash247.com/stena-drilling-rig-handed-early-termination-statoil/

Keppel Verolme to upgrade semisubmersible for repeat customer

Fri Aug 14 08:42:55 CEST 2015 arnekiel

Keppel Verolme BV (Keppel Verolme), a wholly owned subsidiary of Keppel Offshore & Marine Limited (Keppel O&M) in the Netherlands, has secured a contract from repeat customer Stena Drilling Ltd.The contract is the repair and upgrade of STENA DON, a harsh environment semisubmersible (semi) for Stena Drilling Ltd. Part of the yard’s work scope for this project is a midlife upgradefor the fourteen year old vessel, which includes maintenance and renewal of the drillingequipment and accommodation. The rig will undergo its regular Special Periodic Survey (SPS) as well as maintenance works, thruster overhauls and a painting program The vessel was docked in Keppel Verolme’s large dry-dock no. 7 on 12 August, 2015

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data