General information

IMO:
9419175
MMSI:
235080274
Callsign:
2DMO6
Width:
32.0 m
Length:
240.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
317.1° / 0.0
Heading:
98.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Harwich (Harwich Berth 2)
Area:
North Sea
Last seen:
2024-12-22
< 1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-22
59m
2024-12-21
2024-12-21
5h 23m
2024-12-21
2024-12-21
3h 55m
2024-12-20
2024-12-20
4h 58m
2024-12-20
2024-12-20
3h 41m
2024-12-19
2024-12-19
5h 1m
2024-12-19
2024-12-19
3h 58m
2024-12-18
2024-12-18
4h 56m
2024-12-18
2024-12-18
4h 18m
2024-12-17
2024-12-17
4h 46m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hook of Holland
2024-12-21
Leave
Hook of Holland
2024-12-21
Enter
Hook of Holland
2024-12-20
Leave
Hook of Holland
2024-12-20
Enter
Hook of Holland
2024-12-19
Leave
Hook of Holland
2024-12-19
Enter
Hook of Holland
2024-12-18
Leave
Note: All times are in UTC

Latest news

Ferry sailing again

Fri Jan 19 18:35:09 CET 2018 Timsen

The "Stena Britannica" sailed from Harwich on Jan 17 at 6.35 p.m., bound for Schiedam. The Essex fire brigade has completed its environmental impact report and sent to Environment Agency and launched a level 2 investigation into cause of fire. The fire had been confirmed extinguished, no signs of any pollution or sheen. All decks were cleared of vehicles.

Fire on ferry soon contained

Wed Jan 17 17:39:44 CET 2018 Timsen

A fire broke out aboard the "Stena Britannica" on its way from Hoek van Holland to Harwich International Port in the morning of Jan 17, 2018. The fire started in a truck of a customer in the lowerhold (deck 1) of the vessel.The Essex County Fire and Rescue Service was called at 4.20 a.m. to the port in Parkeston Quay, after being alerted by the Coastguard that there was a fire aboard the ship which due to dock at Harwich at 5 a.m. The fire was found in a refrigerator lorry on a lower deck and had spread to a number of surrounding vehicles. As the fire was on a lower deck of the ship and in a confined space the area had become smoke logged and was difficult to access. The firefighters worked with the ship’s crew and the Port Authority to organise freight to be removed to allow access to tackle the fire. Once onboard firefighters began tackling the fire in sections and brought it under control quickly despite difficult conditions. The East of England Ambulance Service was called around 6.20 a.m and sent two rapid response vehicles, two specialist ambulance units (hazard area response teams) and an ambulance officer.The flames were put out by 7 a.m., but remained on board to ventilate the vessel and damp down hotspots. The fire was extinguished by crew and the vessel proceeded to Harwich where passengers disembarked. At 10.15 a.m. the vehicles involved were taken off the ship while firefighters continued to work at the scene. An investigation is set to get underway into the cause. While there was nothing to suggest it was suspicious, nothing has been ruled out at this stage. There were no reported injuries. Report with photos and video: http://www.harwichandmanningtreestandard.co.uk/news/15847385.Fire_breaks_out_on_ship_carrying_400_people_into_port/

Stena Britannica with new livery and scrubbers fitted after docking

Wed Nov 16 10:01:38 CET 2016 arnekiel

During Stena Britannica’s docking period on Damen Shipyard in Rotterdam she was the first vessel in Stena Lines fleet to get a new updated livery with green waves complemented by the strapline “Connecting Europe for a Sustainable Future”. ​​This is the new standard for Stena Lines ships livery and it will be implemented on the vessels in connection with planned dockings. In total 17 ships in Stena Lines fleet have a planned docking period during 2016 and 2017. During the docking period Stena Britannica also got scrubbers installed.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data