General information

IMO:
9101730
MMSI:
304219000
Callsign:
V2EA7
Width:
21.0 m
Length:
166.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Antigua and Barbuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
294.2° / 0.0
Heading:
285.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
North Sea
Last seen:
2024-12-22
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-15
2024-12-16
1d 42m
2024-12-13
2024-12-13
43m
2024-12-12
2024-12-12
1h 9m
2024-12-11
2024-12-12
1d 5h 56m
2024-12-05
2024-12-06
1d 32m
2024-11-30
2024-11-30
18h 44m
2024-11-25
2024-11-25
3h 16m
2024-11-23
2024-11-24
1d 3h 11m
2024-11-15
2024-11-17
2d 13h 11m
2024-11-08
2024-11-09
1d 4h 55m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Humber entrance
2024-12-22
Leave
Karsto Port Approach
2024-12-18
Enter
Karsto Port Approach
2024-12-17
Leave
Humber entrance
2024-12-16
Enter
Humber entrance
2024-12-15
Leave
Wangerooge
2024-12-13
Leave
Note: All times are in UTC

Latest news

Repairs of collision damage completed

Fri Feb 10 22:23:15 CET 2012 Timsen

The "Splittnes" departed from Bremerhaven after completition of repairs at Lloyd Yard on Feb 2 bound for Immingham als first port of call where it moored on Feb 6, sailing further to Kingston upon Hull and Jelsa, while the Panama-flagged container m/v "Mol Efficiency" remains at the Columbus Quay in Bremerhaven since Jan 19 after the repair was completed.

SPLITTNES 9101730

Wed Nov 30 21:31:17 CET 2011 Timsen

While the "Mol Efficiency" (IMO: 9251365) is still under "wet repair" at the Lloyd-Yard Bremerhaven with the bow trimmed down to get the rudder gear above water, the "Splittnes" departed from the Columbus Quay on Nov 30 at 7 a.m. and moored at Lloyd Yard at 8.20 a.m. for drydocking in the small floating dock. German report with photo: http://www.radiobremen.de/nachrichten/kurz_notiert/kunosplitnessimdock100.html Photo of Mol Efficiency under repair: http://forum-schiff.de/phpBB3/viewtopic.php?f=2&t=23#p68032

Gravel cargo unloaded

Sun Nov 27 21:13:59 CET 2011 Timsen

On Nov 26 the "MOL Efficiency" sailed to the Lloyd-Yard where repairs of the steering gear started immediately. The "Splittnes" unloaded its cargo on Nov 27 at the bulkterminal in Bremerhaven and is meanwhile back on even keel. Photos of both vessels: http://forum-schiff.de/phpBB3/viewtopic.php?f=2&t=23

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data