General information

IMO:
8101628
MMSI:
Callsign:
S9UJ87
Width:
13.0 m
Length:
81.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Sao Tome and Principe
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
169.7° / 0.0
Heading:
240.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Aliaga (Aliaga Shiprecycling Yard)
Area:
Aegean Sea
Last seen:
2024-11-14
7 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
7 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-14
2024-11-15
12h 3m
2024-08-20
2024-08-27
6d 23h 58m
2024-07-20
2024-07-31
11d 1h 23m
2024-05-31
2024-06-02
1d 18h 36m
2024-04-22
2024-04-25
3d 7h 47m
2024-04-08
2024-04-09
1d 1h 48m
2024-03-18
2024-03-22
3d 18h 18m
2024-03-11
2024-03-13
1d 6h 29m
2024-02-23
2024-02-26
2d 23h 53m
2023-12-29
2023-12-30
1d 8h 21m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Marmara Island
2024-11-06
Enter
Bosphorus Bridge 1
2024-11-05
Enter
Bosphorus Bridge 2
2024-11-05
Enter
Bosphorus Bridge 2
2023-08-17
Leave
Bosphorus Bridge 1
2023-08-17
Leave
Marmara Island
2023-07-06
Leave
Kreta
2023-05-10
Enter
Note: All times are in UTC

Latest news

Beached

Fri Nov 15 15:57:27 CET 2024 BerndU

Beached at Aliaga 14.11.24 https://www.facebook.com/photo/?fbid=10160697267330036&set=gm.10163616823123943&idorvanity=6884293942

arrived Aliaga Anchorage

Sun Nov 10 11:21:07 CET 2024 BerndU

arrived Aliaga Anchorage 07.11.24

Engine failure in Istanbul Strait

Mon Jan 29 12:42:42 CET 2018 Timsen

The "Hilmi K." while en route from Tekirdag to Varna in ballast, suffered an engine failure at Anadolukavagi point in the Istanbul Strait on Jan 28, 2018, at 07.30 a.m. The Coastal Safety tug "Kurtarma-3" immediately attended the scene for vessel and strait traffic safety. Subsequently, the vessel was shifted to a safe anchorage in the strait and dropped anchor. The vessel will resume the strait passage upon completion of permanent repairs and satisfaction of the strait authority. The vessel has to pay tug assistance expenses to Coastal Safety account, prior to departure. Repairs have commenced by the crew. On Jan 29 the ship dropped anchor off Varna.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data