SKY RANGER
Course/Position
Latest ports
Latest Waypoints
Latest news
Detention in Oristano
On Feb 10, 2025, the 'Sky Rander' was detained in Oristano with 14 deficiencies, ten of which being regarded as seriously and grounds for a detention: 1) Cargo operation incl. equipment - Atmosphere testing instruments Broken 2) Fire safety - Evaluation of crew performance Lack of training 3) Emergency system - Emergency source of power - emergency generator Not as required 4) Emergency systems - Enclosed space entry and rescue drills Not as required 5) Structural conditions - Ballast, fuel and other tanks' Not as required 6) Life saving Appliances - On board training and instructions Not as required 7) Safety of navigation - Magnetic compass Not as required 8)) Safety of navigation - GNSS Receiver/terrestrial radio navigation system Inoperative 9) Radio communication - Reserve source of energy Not as required 10) ISM - Ism certificate Not as required The vessel was released again on Feb 17 and left the port en route to Castellon. The last detention was on Aug 7, 2024, in Setubal with five deficiencies for three days. https://www.facebook.com/profile.php?id=100063576908591
Engine trouble off Wangerooge
On March 15, 2020, the 'Rova', coming from Rekefjord, suffered engine trouble in the German Bight, shortly before Wangerooge, and requested tug assistance. The tugs 'Stella' and 'Florian' were deployed to the ship and towed it to Wilhelmshaven and brought it to the dock at the Rova Hafenumschlag GmbH at 1.40 p.m. The damage was repaired at the quay, and the ship left the port after repairs again on March 17 at 5.35 p.m., headed to Rekefjord with an ETA as of March 19. Photo: https://scontent-dus1-1.xx.fbcdn.net/v/t1.0-9/89894446_1504978286346442_3168712899736633344_n.jpg?_nc_cat=103&_nc_sid=8024bb&_nc_ohc=dpjD8Qfqh3cAX-shoCY&_nc_ht=scontent-dus1-1.xx&oh=1d4280f38599f6a13a57a6310ad3abd9&oe=5E95598B
Upload News