General information

IMO:
9350537
MMSI:
314700000
Callsign:
8PFO6
Width:
18.0 m
Length:
128.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Barbados
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
210.2° / 0.0
Heading:
257.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
NORTH ATLANTIC OCEAN
Last seen:
2024-11-22
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-17
2024-11-19
2d 5h 21m
2024-11-07
2024-11-08
1d 28m
2024-10-24
2024-10-25
1d 5h 40m
2024-10-11
2024-10-16
5d 3h 13m
2024-10-06
2024-10-09
3d 6h 29m
2024-09-05
2024-09-06
21h 19m
2024-09-04
2024-09-04
16h 42m
2024-08-18
2024-08-20
1d 22h 38m
2024-08-08
2024-08-17
8d 5h 40m
2024-08-03
2024-08-08
4d 22h 10m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Strait of Gibraltar
2024-11-16
Enter
Pantelleria East
2024-11-16
Leave
Isla de Alboran
2024-11-16
Leave
Sizilien
2024-11-16
Leave
Bosphorus Bridge 1
2024-11-07
Enter
Bosphorus Bridge 2
2024-11-07
Enter
Bosphorus Bridge 1
2024-10-27
Leave
Note: All times are in UTC

Latest news

Cargo ship refloated

Mon Jan 16 09:44:27 CET 2017 Timsen

After a day of preparation and attempts, the "Sigma" could be refloated on Jan 15 just before midnight from the beach in the district of Ardenza in Livorno. The operation, coordinated by the port master in Livorno, had started at 7.30 p.m. and was carried out with the help of a tug of the Gruppo Neri before the weather conditions could become problematic. The ship was towed to the port of Livorno for checks and repairs and docked at Livorno Dry Docks on Jan 16 at 3 a.m. Italian reports with photos and video: http://iltirreno.gelocal.it/regione/toscana/2017/01/16/news/e-fatta-liberata-nella-notte-la-nave-sigma-incagliata-a-livorno-video-1.14719568?refresh_ce http://www.meteoweb.eu/2017/01/livorno-disincagliata-nella-notte-la-nave-sigma/833095/ http://www.lanazione.it/livorno/cronaca/nave-incagliata-inchiesta-disastro-colposo-1.2817901 http://www.emergency-live.com/it/news/report-le-operazioni-di-disincaglio-della-sigma-di-fronte-allardenza-di-livorno/ http://www.quilivorno.it/news/cronaca/mercantile-si-incaglia-davanti-alla-rotonda-noi-a-tu-per-tu-col-libeccio-guarda-la-diretta-nave-rompe-gli-ormeggi-in-porto/

Grounding off Livorno

Sun Jan 15 13:44:02 CET 2017 Timsen

The "Sigma" with a crew of 18 was pushed aground by strong winds with gusts of up to 50 knots at Livorno beach just meters from the Rotunda of Ardenza, on Jan 13, 2017, at 11.30 a.m. The unloaded vessel was at anchor, but the anchor dragged, and a patrol boat and a port tug came too late with their attempts to avoid the grounding of the zigzagging ship at Gabbiano in the Tre Ponti area and tow the vessel off the coast. On Jan 14 around 11 a.m., after a meeting which took place involving the master, a Ukrainian citizen of 52 years, and a pool of experts in order to examine the situation and plan the next steps, green light was given to the removal of the grounded ship. After a day of preparations, salvage operations were suspended at 7 p.m. and postponed to Jan 15. During the afternoon the ship was emptied of ballast water to be lightened. Then it was connected with two cables to the tug "Neri", but the whole operation was delayed, partly because it was safer to operate during daylight. On Jan 15 in the early morning operations to pull the ship off were resumed. Italian reports with photos and videos: http://iltirreno.gelocal.it/livorno/cronaca/2017/01/14/news/nave-incagliata-il-bluff-del-capitano-e-l-errore-che-ha-determinato-il-naufragio-1.14712148 http://www.gonews.it/2017/01/14/nave-sigma-sulla-costa-livornese-oggi-le-operazioni-disincaglio/ http://www.youreporter.it/video_NAVE_SIGMA_INCAGLIATA_Le_tre_fasi_dal_vento_forte_a_fine http://www.toscanamedianews.it/livorno/livorno-sigma-iniziate-le-operazioni-di-disincaglio.htm http://www.agenziaimpress.it/news/effetto-venerdi-13-nave-cargo-africana-incagliata-largo-di-livorno/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data