General information

IMO:
9596571
MMSI:
431050000
Callsign:
7KIJ
Width:
41.0 m
Length:
81.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Japan
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
94.1° / 2.0
Heading:
200.0° / 2.0
Speed:
Max speed:
Status:
moored
Location:
Area:
Taiwan
Last seen:
2024-12-22
3 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-17
5d 1h 54m
2024-10-23
2024-11-24
32d 14h 12m
2024-09-27
2024-10-12
15d 2h 38m
2024-09-24
2024-09-25
1d 5h 44m
2024-09-17
2024-09-18
1d 15h 57m
2024-09-11
2024-09-12
1d 2h 58m
2024-09-03
2024-09-07
3d 11h 15m
2024-08-29
2024-08-30
1d 4h 29m
2024-08-19
2024-08-22
3d 7h 52m
2024-08-07
2024-08-14
7d 6h 1m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hook of Holland
2019-03-15
Enter
Vlissingen
2019-03-15
Enter
Vlissingen Port
2019-03-14
Enter
Note: All times are in UTC

Latest news

Meerwind Süd windfarm installation complete

Sat Apr 19 09:06:21 CEST 2014 arnekiel

WindMW GmbH has recently celebrated installation of the final turbine and offshore converter station at their 288MW Meerwind Süd offshore windfarm in the German North Sea. The 'Seajacks Zaratan' has been active in construction of the Meerwind windfarm

Jackup Rig berthed at Steubenhöft Cuxhaven due to technical trouble

Fri Nov 16 11:04:32 CET 2012 Timsen

Due to technical trouble the "Seajacks Zaratan" which is contracted by the WindMW GmbH Bremerhaven with the transport and installation of monopiles and transition pieces in a wind plant off Helgoland, had to berth at the Steubenhöft in Cuxhaven in the late afternoon of Nov 15, 2012, instead of using its normal berth 9.4. How long the ship would have to remain there could not yet be specified by its agents Sartori & Berger. German report with photos: http://www.cn-online.de/lokales/news.html?tx_ttnews%5Btt_news%5D=33477&tx_ttnewsextender%5BimgIndex%5D=0&cHash=4c773cc114aa609a69db55babb19e9f7

Start of construction work for first wind plant off Heligoland

Wed Aug 29 10:21:17 CEST 2012 Timsen

The "Seajacks Zaratan" was the first large ship to use the new berth 9.4 in Cuxhabven on Aug 28, 2012, in the afternoon. Secondly, it marked the start of the construction work of the first wind plant off Heligoland for which Cuxhaven is the base port. The British company Sejacks UK Ltd. was contracted to build a total of 80 plants for the WindMW GmbH in Bremerhaven 23 kilometers north of the island, thereby using Siemens turbines with a capacity of 3.6 MW (total 288 MW). The foundation of the single units os consisting of a single, 60-meter and 600-ton monopile, which will be connected with a transition piece and the the tower, nacelle and the rotor blades. The monopile and the somewhat shorter transition pieces are manufactured in the factory Cuxhavener Ambau GmbH. The "Seajacks Zaratan" will carry three foundation pipes to the wind plant and ramm it into the sea bottom at a water depth of 22 to 26 meters. German report with photos: http://www.cn-online.de/lokales/news/cuxhaven-liefert-die-fundamente.html?tx_ttnewsextender%5BimgIndex%5D=0&cHash=ba4916a6d592bc279694ff8e1cec9411

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data