SCANDINAVIA
Latest ports
Latest Waypoints
Latest news
Tanker back in Copenhagen after oil recovery
On Sep 12, 2013, the "OW Scandinavia" returned to Copenhagen after having taken aboard 251 tons of fuel oil from the sunken Bulkcarrier "Fu Shan Hai" after the recovery ended in the night after 50 days of work. As the water at the seabed has a temperature of only four degrees, the oil in the tanks had become viscous. To pump up the oil, it was therefore warmed up with steam to 75 degrees. JD Contractor who has been responsible for the emptying of the tanks of the "Fu Shan Hai" working with the "Vina", the "Gunnar Thorson", "Gunnar Seidenfaden" and the 2OW Scandinavia".
Oil of "Fu Shan Hai"'S main fuel tanks pumped onto lighter tanker
On Aug 20, 2013, the last oil from the main fuel tanks of the sunken Bulkcarrier "Fu Shan Hai" off Bornholm was pumped into the "OW Scandinavia". The two large fuel tanks in the Chinese ship Fu Shan Hai have now been completely emptied of 10 year old oil. All in all, there has been pumped more oil up than expected. It turned out that the tanks contained far more oil than was estimated when the ship sank in the Hammergattet. There were also picked up some drums with oil, but there was still more oil left in the ship. The salvage company JD Contractor is responsible for the fuel removal. Much of the work is done by divers, who are based on the diving vessel "Vina", which together with the tanker, one of the Navy's Environmental ships and a patrol vessel was participating in the work. If the weather cooperates, the work was expected to be finished in early September 2013. Danish report with photo: http://www.maritimedanmark.dk/?Id=19828
OW Scandinavia taking oil of sunken bulkcarrier off Bornholm
On July 29, 2013, the "OW Scandinavia" sailed from Copenhagen to the sinking site of the Chineese bulkcarrier “Fu Shan Hai” off Bornholm where 13 divers of the JD Contractor A/S were working to recover the remaining fuel on board the wreck. They localized 300 cbm oil which was pumped onto the tanker which was anchored above the wreck. The works were assisted by the patrol boat "Havfruen", the diver boat "Vina" and the anti pollution vessel "Gunnar Thorson" and were expected to take two more weeks. Danish report with photo: http://www2.forsvaret.dk/nyheder/nationale_opgaver/Pages/Kinesiskvragt%C3%B8mmesforolie.aspx
Upload News