General information

IMO:
9805568
MMSI:
244890472
Callsign:
PBPH
Width:
20.0 m
Length:
141.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
307.7° / 0.0
Heading:
303.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Cuxhaven (Siemens Gamesa Cuxhaven - Berth 01)
Area:
Germany
Last seen:
2024-12-22
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-22
3h 56m
2024-12-17
2024-12-19
2d 5h 42m
2024-12-11
2024-12-13
2d 3h 11m
2024-12-03
2024-12-04
16h 41m
2024-12-01
2024-12-03
2d 6h 10m
2024-11-29
2024-11-30
21h 55m
2024-11-26
2024-11-28
1d 14h 14m
2024-11-20
2024-11-23
2d 12h 36m
2024-11-19
2024-11-20
22h 10m
2024-11-14
2024-11-15
1d 4m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Cuxhaven
2024-12-22
Enter
Elbe 1
2024-12-22
Enter
Wangerooge
2024-12-22
Enter
Norderney
2024-12-22
Enter
Borkum
2024-12-22
Enter
Terschelling
2024-12-21
Leave
Den Helder
2024-12-21
Enter
Note: All times are in UTC

Latest news

Heavy load carrier allided with drilling rigs

Tue Apr 11 23:09:45 CEST 2017 Timsen

A large scale evacuation took place in the port of Esbjerg in the night of Apr 10, 2017, when the crew of the "Rotra Vente" following an engine failure just as the ship was heading out of the harbor. In the strong western wind with a strong inward tide the Siemens' vessel suffered a blackout and began to drift back to port. The ship dropped anchor, but the strong wind sent it on a collision course towards the two Maersk drilling rigs "Maersk Resolve" and "Maersk Resolute", and both had to be evacuated. The ship hit one of the rigs with low speed and got wedged in the rig's helipad. With the rising tide was important to get the ship quickly free again, so two tugs and a pilot boat were sent to get it under control. There was no major damage, but a mast and antennas that were entangled in the platform broke off. The draught of the vessel was increased by taking on ballast water in the stern, so the tugs managed to pull the ship to a berth at the Aries Quay where it is detained on Apr 11 for further inspection of the damage. Maersk Drilling was working with the Port of Esbjerg and relevant authorities. Danish report with photos: http://www.jv.dk/esbjerg/Motorstop-i-havnen-To-boreplatforme-maatte-evakueres/artikel/2496318

Box ship converted to heavy-load ro-ro coaster

Thu Mar 02 10:53:31 CET 2017 arnekiel

Container ship Rotra Vente has been rebuilt by Holland Shipyards in Hardinxveld-Giessendam to carry large nacelles for direct-drive offshore wind turbines.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data