RIVER SPIRIT
Course/Position
Latest ports
Latest Waypoints
Latest news
Released from detention on June 29 after 3 months of detention
The vessel was detained in Thurrock on 20 March 2012 with nine deficiencies including three grounds for detention in particular because the safe manning document was not fit for the intended voyage to Miami (USA), the minimum safe manning document did not show all the relevant members of the crew, the safety management certificate (SMC) was missing and the deficiencies identified as ISM are objective evidence or a serious failure or a lack of effectiveness of the implementation of the ISM code. In addition various certificates were missing: the Safety Equipment Certificate (SEC); the Safety Construction Certificate (Saf- Con); the Safety Radio Certificate (RAD); and the load line (ILL). The gangway did not have a safety net.
Upload News