General information

IMO:
9085895
MMSI:
511101283
Callsign:
T8A4587
Width:
22.0 m
Length:
143.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Palau
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
44.2° / 0.0
Heading:
44.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Bosporus
Last seen:
2024-11-11
6 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-10-08
2024-10-08
8h 49m
2024-10-06
2024-10-07
1d 2m
2024-10-03
2024-10-05
1d 6h 10m
2024-09-07
2024-09-11
4d 4h 41m
2024-08-15
2024-08-25
9d 17h 28m
2024-07-07
2024-07-10
3d 4h 46m
2024-06-13
2024-06-15
1d 5h 21m
2024-05-27
2024-05-31
3d 18h 11m
2024-05-16
2024-05-18
1d 23h 27m
2024-05-08
2024-05-10
1d 8h 54m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Bosphorus Bridge 2
2024-11-11
Leave
Bosphorus Bridge 1
2024-11-11
Leave
Marmara Island
2024-11-10
Leave
Pantelleria East
2024-11-02
Enter
Sizilien
2024-11-01
Enter
Sizilien
2024-10-13
Leave
Pantelleria East
2024-10-13
Leave
Note: All times are in UTC

Latest news

Two tugs damaged in incident on Thames

Fri Dec 21 10:25:40 CET 2012 Timsen

Already on Nov 15, 2012, at 6.00 a.m. the "Amber", leaving Tilbury Power Station suffered engine failure. The vessel subsequently went aground upstream of the PLA’s Denton Wharf base, having struck several moorings to which barges and tugs were secured. The Port of London Authority (PLA) managed the response to the incident from its London Port Control Centre at Gravesend. A PLA harbour service launch was on scene along with members of the PLA Marine Services team who are in the process of re-securing a barge and the tugs "Recruit" and "Mersina" which had gone adrift. The "Amber" was re-floated at 8.45 a.m. and berthed alongside Tilbury Landing Stage before moving into Tilbury Dock for inspection and repairs in the afternoon. The tugs and barge which were adrift earlier were secured. The "Mersina" remains on Denton Slipway to date, it had suffered damage at the shaft. The "Recruit" was threatened to become a write off. The "Amber" left Tilbury again on Nov 30.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data