General information

IMO:
MMSI:
244574000
Callsign:
PBAA
Width:
16.0 m
Length:
37.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
264.8° / 0.0
Heading:
264.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Area:
North Sea
Last seen:
2024-12-29
2 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-13
15d 16h
2024-12-12
2024-12-13
15h 53m
2024-12-12
2024-12-12
11m
2024-12-12
2024-12-12
10m
2024-12-12
2024-12-12
11m
2024-12-11
2024-12-12
22h 10m
2024-12-11
2024-12-11
10m
2024-12-11
2024-12-11
8m
2024-12-11
2024-12-11
10m
2024-12-10
2024-12-11
22h 11m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Vlissingen Approach
2024-12-13
Leave
Vlissingen
2024-12-13
Enter
Vlissingen
2024-12-13
Leave
Note: All times are in UTC

Latest news

Ferry suffered broken generator

Wed Sep 11 09:30:47 CEST 2019 Timsen

The "Willem-Alexander" was sidelined in Flushing for repairs on Aug 8, 2019, at 6.30 p.m. after a generator that drives the propeller was jammed. The repair of the broken generator was estimated to take two months. The cause of the damage remained yet to be found out.

Ferry sidelined due to radar trouble

Wed Jun 01 11:51:15 CEST 2016 Timsen

The ferry service between Flushing and Breskens had to be reduced to one departure per hour on June 1, 2016, after the "Prins Willem Alexander" had to remain at the quay in Flushing for repairs after having suffered trouble with the radar. Due to the mist it was decided it would be too risky to operate the ship without properly working navigational equipment. The ferry had berthed in Flushing on May 1 at 6.30 p.m.

Ferry under repair with propeller shaft trouble

Wed Sep 03 10:16:32 CEST 2014 Timsen

On Aug 29, 2014, the ferry service between Flushing and Breskens was reduced to a limited timetable with one sailing per hour, after the "Prins Willem Alexander" was taken out of service due to a technical fault. It meanwhile became clear that the ferry had a problem with the propeller shaft. IT was docked in the morning of Sep 3 for repairs which were expected to take until Sep 5 at least. Ferry operator Veolia hoped to resume to normal timetable on Sep 6, but this was dependent on the development of the repair.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data