PEAK BORDEAUX
Course/Position
Latest ports
Latest Waypoints
Latest news
Fuel pipe leak issue
The "Peak Bordeaux", en route from Tees to Amsterdam suffered a small leak in the fuel pipe in position 054 02 18.6 N, 000 16 46.8 E, 13.5 miles southeast of Flamborough, in the morning of June 8, 2019. The issue was rectified quickly and the vessel was underway again at 7 a.m.. It berthed in the Coenhaven in Amsterdam on June 9 at 11.15 a.m.
sold
sold en Bloc with 3 other Ships to Clients of Peak Shipping 24 million USD
ABIS BORDEAUX and ABIS BREMEN christened in Harlingen
The ABIS BORDEAUX which is built in Hangzhou, China and delivered April 20th 2011, The ABIS BREMEN and the ABIS BRESKENS from which the hull is built at the Partner Shipyard in Stettin (Poland) and completed by Skipkits BV Harlingen. The christening ceremony of the ABIS BORDEAUX and the ABIS BREMEN was held at September 9th, 2011 in the Dutch port of Harlingen. Main dimensions: Loa 89,95 m, Lbpp 84,95 m., Bmld 14,00 m, Dmld 6,20 m, d 5,35 m, air draught 20,5 m. - 2.978 GT, 1.384 NT, 3.900 DWT Main engine MaK Caterpillar type 8M20C, 1.520 kW at 1.000 rpm.Cargo hold capacity 5.050 m3 - Hold opening 56 x 11 x 8,2 m - Tanktop loading 15 t/m3 Container capacity total 214 TEU (in hold 108 TEU)
Upload News