General information

IMO:
MMSI:
367183360
Callsign:
WDD7216
Width:
8.0 m
Length:
28.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Towing Vessel
Ship type:
Flag:
United States of America
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
196.0° / 0.0
Heading:
182.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Seattle (Seattle Port)
Area:
North America West Coast
Last seen:
2024-11-28
5 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
6 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-14
14d 3h 22m
2024-11-13
2024-11-13
7h 50m
2024-11-10
2024-11-13
2d 15h 25m
2024-11-09
2024-11-10
19h 39m
2024-11-07
2024-11-09
1d 7h 31m
2024-07-21
2024-08-08
18d 51m
2024-07-20
2024-07-20
5h 54m
2024-07-20
2024-07-20
8h 22m
2024-07-18
2024-07-19
18h 12m
2024-04-15
2024-07-18
93d 1h 41m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

NTSB report into allsion published

Wed Sep 25 11:47:08 CEST 2024 Timsen

The National Transportation Safety Board said on Sep 24, 2024, that the captain of the 'Montlake' failed to line up his vessel correctly while approaching the Hylebos Bridge in Tacoma, Washington on Oct 12, 2023,, causing the assisting tug 'Olympic Scout' to strike the bridge’s already deteriorated fender system. The 'Montlake', coupled to the 'Sodo', a 289-foot-long, 78-foot-wide barge, forming an articulated tug and barge unit, and was navigatomg outbound on the Hylebos Waterway in Tacoma. The captain requested the Hylebos Bridge operator to open the bridge. While waiting, the ATB had to pause,, causing its bow to drift from the channel’s center towards port side. Although the captain attempted to steer starboard to align with the bridge, the drag from the 'Olympic Scout' on the port bow prevented the ATB from moving in that direction. When the ATB began its transit of the waterway, it was 1,276 feet from the bridge. The channel between the Hylebos Bridge fenders measured 150 feet wide. However, the combined width of the 'Montlake/Sodo' (78 feet) and the 'Olympic Scout' (26 feet) was 104 feet, leaving only 23 feet of clearance on each side of the vessels. Because of the short distance to the bridge and the speed of the ATB, there was insufficient time to correct the lineup before the 'Olympic Scout' struck the fender. The investgators suggested that slowing or fully stopping the ATB’s forward motion earlier would have provided the operators more time to correct the lineup and successfully transit through the opening between the bridge’s protective fendering. While the Hylebos Bridge itself remained undamaged, the fender system required replacement at a cost of $2.43 million. Notably, precasualty inspections in 2017 and 2022 had already identified significant deterioration of the fender piles due to marine borer damage and fungal decay. A marine surveying and consulting firm stated, The damage caused by the [Olympic Scout contact] resulted in significantly more damage being sustained as would have been, had the fendering structure been of sufficient structural strength. Full report: https://www.ntsb.gov/investigations/AccidentReports/Reports/MIR2426.pdf

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data