General information

IMO:
7936791
MMSI:
205275000
Callsign:
OPBG
Width:
8.0 m
Length:
42.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Fishing Boat
Ship type:
Flag:
Belgium
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Fishing
Course:
111.2° / 0.0
Heading:
511.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
English Channel
Last seen:
2024-11-26
1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-21
2024-11-22
1d 2h 8m
2024-11-14
2024-11-14
8h 42m
2024-11-07
2024-11-08
1d 1h 27m
2024-10-30
2024-10-31
23h 31m
2024-10-20
2024-10-21
1d 2h 15m
2024-10-10
2024-10-14
3d 18h 42m
2024-09-29
2024-09-30
1d 9h 18m
2024-09-21
2024-09-21
12h 2m
2024-09-10
2024-09-10
10h 4m
2024-08-29
2024-09-03
5d 4h 4m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Le Havre Approach
2024-11-22
Leave
Le Havre
2024-11-22
Enter
Le Havre
2024-11-21
Leave
Le Havre Approach
2024-11-21
Enter
Dover
2024-11-15
Enter
Calais
2024-11-14
Enter
Calais
2024-10-28
Leave
Note: All times are in UTC

Latest news

Marbi started trials

Tue Aug 14 10:15:27 CEST 2012 Timsen

In the morning of Aug 13, the "Marbi - O33" started trials sailing for the first time after its slid off a slip during minor repairs in May. Both the ship as the slipway were suffered a lot of damage. Eventually the ship was again straightened by several cranes on floating pontoons. During the recent trials another problem with the winch occurred. The winch was to be checked by a specialized firm on Aug 14 at the Baales Quay in Oostende, and be tested again so that the ship is ready to sail then. Dutch report with photo: http://www.nieuwsblad.be/article/detail.aspx?articleid=DMF20120813_00257536

Marbi upright again after three weeks

Mon Jun 11 09:45:36 CEST 2012 Timsen

Salvors of Mammoet have righted the "Marbi" in the midday hours of June 10 with the help of a large crane. The operation lasted about 34 minutes. The area wascordoned off for safety reasons before. The costs of the salvage were about 300000 Euro. Dutch report with photo: http://www.nieuwsblad.be/article/detail.aspx?articleid=DMF20120610_00179031

Salvage delayed due to inclement weather

Fri Jun 08 17:24:03 CEST 2012 Timsen

Strong wind delayed the salvage operation for the "Marbi" on Oostende. The preparations went ahead as planned. The cranes are being mounted on two pontoons. On June 9, the vessel will be righted and on June 10 it will be lifted, depending on the weather. Belgian report with photo: http://kw.knack.be/west-vlaanderen/nieuws/algemeen/werken-gestart-om-gekanteld-vissersschip-o33-marbi-te-lichten/article-4000113657176.htm

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data