General information

IMO:
9831488
MMSI:
548973000
Callsign:
DUJR
Width:
30.0 m
Length:
180.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Philippines
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
273.3° / 0.0
Heading:
2.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Venice (Venice Commercial Terminals)
Area:
Italy
Last seen:
2024-11-26
4 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
8 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-22
4d 50m
2024-09-29
2024-10-01
2d 4h 17m
2024-09-20
2024-09-27
6d 22h 21m
2024-09-17
2024-09-18
18h 41m
2024-09-01
2024-09-11
9d 4h 45m
2024-08-22
2024-08-24
2d 9h 4m
2024-07-09
2024-07-10
1d 13h 55m
2024-07-02
2024-07-06
4d 14h 30m
2024-06-23
2024-06-26
2d 10h 32m
2024-06-06
2024-06-07
8h 42m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Pantelleria East
2024-11-17
Enter
Sizilien
2024-11-16
Enter
Isla de Alboran
2024-11-14
Enter
Strait of Gibraltar
2024-11-13
Leave
Fuerteventura
2024-11-11
Leave
Canary Islands
2024-11-11
Leave
Cape Town
2024-10-25
Leave
Note: All times are in UTC

Latest news

Detention in Muuga

Fri Oct 09 09:49:18 CEST 2020 Timsen

The 'Nord Santiago' was detained by the Estonian Maritime Authorities on request of an Estonian Seamen Trade Union inspector and ITF representative as the employment contracts of all 18 Filipino crew members were expired. The ship had berthed at Muuga on Oct 4, 2020, at 8.10 a.m. upon its arrival from Dakar, where it had sailed on Sep 14. The owner has been requested to carry out a crew change.

Grounding on Rio Grande

Mon May 20 11:20:06 CEST 2019 Timsen

The "Nord Santiago" ran aground on May 16, 2019, around 3 p.m. in the Lagoon Dos Patos, Rio Grande do Sul, three hours after departing from Porto Alegre, sailing in ballast, after veering off the fairway. The bulk carrier was stuck on muddy bottom with a slight to port until the morning of May 19. It was refloated with the help of two tugs at 10 a.m. and was anchored inside the lagoon. After inspections it resumed the voyage to Sao Francisco do Sul, ETA May 22. Spanish report with photo: https://guaiba.com.br/2019/05/18/navio-encalha-no-guaiba-e-bloqueia-acesso-a-triunfo-e-porto-alegre/

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data