General information

IMO:
9056595
MMSI:
310362000
Callsign:
ZCDD8
Width:
24.0 m
Length:
167.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Bermuda
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
279.5° / 0.0
Heading:
269.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
North Sea
Last seen:
2024-11-24
< 1 min ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-11-24
2024-11-24
13h 11m
2024-11-23
2024-11-23
10h 52m
2024-11-22
2024-11-23
4h 7m
2024-11-22
2024-11-22
3h 43m
2024-11-21
2024-11-22
4h 14m
2024-11-21
2024-11-21
3h 11m
2024-11-20
2024-11-21
4h
2024-11-20
2024-11-20
4h 4m
2024-11-19
2024-11-20
3h 37m
2024-11-19
2024-11-19
3h 54m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Hook of Holland
2024-11-24
Leave
Hook of Holland
2024-11-24
Enter
Margate
2024-11-23
Leave
Canvey Island
2024-11-23
Enter
Gravesend
2024-11-23
Leave
Gravesend
2024-11-23
Enter
Canvey Island
2024-11-23
Leave
Note: All times are in UTC

Latest news

MCA inspecting sidelined ferry

Thu Apr 21 12:28:26 CEST 2022 Timsen

Another P&O ferry, the 'Norbay' was being inspected on April 20, as the company tried to resume normal operations after sacking nearly 800 seafarers. The Maritime and Coastguard Agency (MCA) has started assessing th ship in the Gladstone Dock in Liverpool, where it has been sidelined since March 17. P&O Ferries hopes the ship will be able to restart sailing on the Liverpool-Dublin route. Eight of their ships will be examined by the MCA after the massive looting to ensure it meets international standards for manning and safe operation, particularly emergency procedures such as firefighting and evacuation. The 'Spirit Of Britain' and 'Pride Of Kent' remained detained after safety concerns were found.

P&O sacks its crews

Thu Mar 17 16:21:07 CET 2022 Timsen

On March 17, 2022, P&O ordered all its ships back into port to sack the 800 crewmembes and replace them by cheap agency workers. At the present time the P&O fleet are located as follows, out of service. Pride of Kent / Canterbury = Dover Spirit of Britain = Dover Spirit of France = Schiedam (refit) Pride of Hull = Hull Pride of Rotterdam = Rotterdam European Highlander = Cairnryan European Causeway = Larne Norbay = Liverpool Norbank = Liverpool It is unclear at this point if Dutch vessels are affected by the crew changes. Replacement crew are on hand at Dover, Cairnryan and Larne.

Stranded ferry released

Tue Apr 21 12:19:35 CEST 2020 Timsen

The 'Norbay' left Liverpool in the night of April 21 at 11.40 p.m. after four days stranded in Seaforth following the bust-up which left crucial supplies in limbo. Top level talks have been ongoing since April 9 following a dispute with Peel Ports, who own and administer the dock facilities of the Port of Liverpool, and who demanded a cheque for nearly £600,000 of what they claimed were outstanding fees. P&O disagreed with that figure, believed it was two thirds that amount, and asked for flexibility to pay the bill at a time when they are losing many tens of thousands pounds a day in revenue due to the global pandemic lockdown. The shipping company also added that their key contact at The Mersey Docks and Harbour Company had been furloughed without their knowledge, interrupting their communications. Now, an agreement has been reached, allowing the 'Norbay' to set sail within the next few hours. The argument sparked anger as P&O were transporting food, medicines and other goods back and forth between Dublin and Merseyside to be supplied to the city and also the north of England. Over the weekend, the impasse deepened with two more ferries also stranded at Dublin Port amid the ongoing stand-off between the company and the Port of Liverpool. On the other side of the Irish Sea, two freight ferries - one owned by P&O and the other chartered by the company - were also unable to set sail for Liverpool because of the row. As the company hastily tried to pursue alternatives, the 'Norbank' was seen on Sunday undertaking berthing trials at the Port of Mostyn in Flintshire. The row was escalated to government circles in Ireland, with a senior official in the Department of the Taoiseach in Dublin saying if the dispute became protracted it could have implications for the supply chain in Ireland. Peel Ports were expected to release their statement shortly.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data