General information

IMO:
7393066
MMSI:
241757000
Callsign:
SVB2633
Width:
12.0 m
Length:
83.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Greece
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
214.1° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moving
Area:
Sea of Crete
Last seen:
2024-12-22
< 1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-21
2024-12-22
15h 52m
2024-12-21
2024-12-21
25m
2024-12-21
2024-12-21
1h 10m
2024-12-21
2024-12-21
20m
2024-12-20
2024-12-21
12h 45m
2024-12-20
2024-12-20
24m
2024-12-20
2024-12-20
39m
2024-12-20
2024-12-20
25m
2024-12-20
2024-12-20
31m
2024-12-20
2024-12-20
22m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Sizilien
2021-05-03
Enter
Pantelleria East
2021-05-03
Enter
El-Jazair
2021-05-03
Leave
Isla de Alboran
2021-05-01
Enter
Strait of Gibraltar
2021-04-30
Leave
Dover
2021-04-25
Enter
Calais
2021-04-25
Enter
Note: All times are in UTC

Latest news

Winch failure in Piraeus

Fri Apr 05 09:41:47 CEST 2024 Timsen

On April 4, 2024, at noon, the Central Port Authority of Piraeus was informed by the Master of the 'Nissos Aegina' about a damage to the electric winch of mooring cables. The Port Authority banned the ferry from sailing until the damage was repaired and a certificate of class maintenance presented by the monitoring classification society. The scheduled route of the ship from Piraeus to Aegina was not served. The passengers were forwarded to their destination by the ship's owning company. The ship resumed sailing at 3.40 p.m. UTC.

Ferry suffered mechanical damage

Wed Mar 20 10:02:47 CET 2024 Timsen

On March 19, 2024, the Central Port Authority of Piraeus was informed by the Master of the 'Nissos Aegina', that the ferry, after its arrival en route from the port of Aegina at the port of Piraeus, suffered a mechanical damage to the generator. The next scheduled sailings of the ship from the port of Piraeus to the port of Aegina were cancelled, while passengers and vehicles were forwarded to their destination by the company with other ships. The port authority banned the ship from sailing until the repair of the damage and the presentation of a certificate of class maintenance by the monitoring classification society.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data