General information

IMO:
MMSI:
211210100
Callsign:
DRHM
Width:
16.0 m
Length:
101.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
159.5° / -127.0
Heading:
279.0° / -127.0
Speed:
Max speed:
Status:
moored
Location:
Kiel (Tirpitzhafen)
Area:
Germany
Last seen:
2024-12-18
4 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2024-12-17
2024-12-18
1d 8h 19m
2024-12-17
2024-12-17
3h 58m
2024-12-13
2024-12-15
2d 1h 51m
2024-12-05
2024-12-10
4d 11h 9m
2024-12-05
2024-12-05
7h 22m
2024-11-29
2024-12-02
3d 10h 30m
2024-11-16
2024-11-22
6d 5h 50m
2024-10-30
2024-11-04
5d 57m
2024-10-24
2024-10-28
4d 10h 57m
2024-10-18
2024-10-21
3d 1h 56m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
Kiel Laboe
2024-12-17
Enter
Fehmarn Nord
2024-12-17
Leave
Mecklenburg Bay
2024-12-16
Leave
Fehmarn Nord
2024-12-16
Enter
Storebaelt
2024-12-15
Enter
Great Belt
2024-12-15
Enter
Helsingborg
2024-12-15
Leave
Note: All times are in UTC

Latest news

Auxiliary ship left repair dock

Mon Feb 04 10:23:50 CET 2019 Timsen

On Feb 2 the "Werra" left the naval base in Wilhelmshaven after repairs to its stern tube with a crew of 60 on board towards Istanbul where it was expected mid of the month to guide a NATO force into the Black Sea and the Mediterranean Sea for manoevers. The ship had entered the dock on Jan 22.

Tender suffered stern tube trouble

Fri Jan 25 12:37:43 CET 2019 Timsen

The "Werra" which had headed to the Mediterranean Sea on Jan 21, 2019, had to aboart its mission and returned to the naval port in Wilhelmshaven for investigations at its stern tube on Jan 23 and was drydocked on Jan 24.

Tender with engine failure towed back to yard in Elsfleth

Sun Sep 30 16:44:54 CEST 2018 Timsen

After having just been overhauled for 7,4 Million Euro at the Shipyard Elsfleth, the engine of the "Werra" failed. On Sep 30, 2018, the ship was towed by the tugs "Holtenau" and "Lütje Hörn" from Kiel back to Elsfleth. German report with photo: http://www.kn-online.de/Kiel/Der-Tender-Werra-muss-zurueck-in-die-Werft

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data