General information

IMO:
MMSI:
520129000
Callsign:
3DZA
Width:
12.0 m
Length:
58.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Fiji
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
260.9° /
Heading:
511.0° /
Speed:
Max speed:
Status:
moving
Area:
SOUTH PACIFIC OCEAN
Last seen:
2023-11-14
375 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
375 days ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2023-11-14
2023-11-14
4h 28m
2023-10-03
2023-10-14
11d 12h 21m
2023-09-27
2023-09-29
1d 23h 42m
2023-04-06
2023-04-07
1d 31m
2023-02-21
2023-03-04
11d 1h 4m
2023-02-21
2023-02-21
21m
2021-04-18
2021-04-19
22h 59m
2021-04-15
2021-04-18
2d 3h 46m
2021-04-12
2021-04-12
5h 24m
2021-02-02
2021-02-03
21h 44m
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Ferry suffered mechanical damage

Tue Dec 25 14:38:33 CET 2018 Timsen

The "Westerland" suffered a mechanical damage near the Natovi jetty in Fiji, on Dec 24, 2018. The vessel experienced a hydraulic defect and was stranded at sea.

The Bligh Water Shipping Ltd suffered a $3 million loss due to damage to ferry

Wed Feb 01 12:15:28 CET 2017 Timsen

The Bligh Water Shipping Ltd. suffered a $3 million loss in revenue as a result of damage sustained by the "Westerland" when it ran aground in Savusavu during the tropical cyclone Winston in February 2016. They lost quite a lot to the damage itself, the cost of repairs and trying to get the business up and running again. In June the vessel was brought to Suva for dry docking and repairs. The dry dock and salvage itself was over $1 million adding to the loss of employment which was quite a challenge for the company.

Cyclone damaged ferry to be repaired until July

Wed May 11 11:23:07 CEST 2016 Timsen

The "Westerland" will resume its operations in July, the owners Blight Water Shipping Limited confirmed on May 10, 2016. The ferry which serviced the Natovi-Savusavu and Lautoka-Malau routes sustained damages during Tropical Cyclone Winston. An underwater survey in Suva required the ferry to dock and get the hull repaired and re-painted. The "Westerland" has not gone up the slipway as they have been booked for June 15. The cost of repairs was around $500,000.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data